Builtie
Miami skyline
Photo: Rhododendrites · CC BY-SA 4.0 · cropped
Miami Construction Report · H1 2026

H1 2026Miami's permit desk belongs to the trades.

20,481permits issued
$9.88Bdeclared value
+0%permits vs H1 2025
  • 18-month permit trend with interactive charts
  • The firms pulling the permits, ranked
  • How Miami compares with nine other markets
  • The 13-slide PDF deck, emailed to you on registration
Miami skyline
Photo: Rhododendrites · CC BY-SA 4.0 · cropped
Miami Construction Report · H1 2026

H1 2026Miami's permit desk belongs to the trades.

Volume is flat year over year and screened value is up 6% to $9.88B. What makes Miami-Dade different is who files: after Lennar, the top of the applicant table is plumbers, electricians and mechanical contractors pulling their own permits, and 4,363 permits — better than one in five — are pulled by the property owner directly.

PREPARED BY Builtie Market COVERAGE Jan 1 to Jun 30, 2026 SOURCE Miami permit record · live database UPDATED September 8, 2026
20,481
Permits issued
January 1 to June 30, 2026 · +0% YoY
$9.88B
Declared construction value
Screened permit-stated cost · +6% YoY
$42K
Median permit value
Largest single permit $264.0M
3,414
Permits a month
H1 average · peak Apr 26 at 3,737
01Market Pulse18-month trend

Flat volume, rising value.

Permit counts sit in a tight 3,000 to 3,800 band every month across both years. The value line is the one that moved, and it moved without the count moving with it — the same number of jobs, worth more each.

Permits issued by month

Monthly · Jan 25 to Jun 26

3 signals inside the market

Value concentration

Ten permits carry 18% of the half's value

10 permits out of 20,481 account for $1.79B of $9.88B in screened declared value. The thousands of smaller permits are volume, not dollars.

Largest single permit

$264.0M on one filing

Residential bldg. Issued April 21, 2026.

Renovation market

26% new construction, 70% existing buildings

5,389 new-building permits carry 73% of declared value. New builds are a minority of the filings and a majority of the money.

02Where The Work Landsnot yet mappable

We cannot map this market yet.

Known gap

Not one Miami permit in the half carries coordinates, so there is no map to draw.

Geocoding this feed is queued work, not a limit of the source: the permits carry addresses, they simply have not been resolved to coordinates yet. Every other number on this page is unaffected — the map is the only section that depends on the field.

03Who Pulls The Permitsapplicants of record

One permit in five is pulled by the owner.

Lennar Homes leads the firm table, then the list turns into subcontractors — Leza's Plumbing, Strada Services, Arnold J Electric. A trade reading this list is looking at its own competitive set as much as at a customer list, and the 4,363 owner-pulled permits underneath it are jobs with no contractor of record at all yet.

Top 10 applicants of record

H1 2026
#Applicant of recordPermitsScreened value
1LENNAR HOMES LLC 428$91M
2LEZA'S PLUMBING CORP 239$35M
3STRADA SERVICES INC 222$35M
4ARNOLD J ELECTRIC INC 215$26M
5KARIBE MECHANICAL SERVICE LLC 160$22M
6D R HORTON INC 135$37M
7ROOF TILE SPECIALISTS LLC 119$14M
8OSCAR AIR CONDITIONING INC 116$22M
9VICTORIA ROOFING INCORPORATED 109$15M
10FOX ELECTRIC ENTERPRISES INC 107$13M
11ENGINEERED SYSTEMS SOLUTIONS LLC 95$4M
12SUNSHINE ELECTRICAL CONTRACTORS CORP 84$6M
13BLUENEST DEVELOPMENT L.L.C. 81$18M
14MESA BROTHERS INC 63$2M
15INFINITY AT YOUR SERVICE LLC 61$3M
16BUILD PRO CONSTRUCTION INC 52$2M
17INTERNATIONAL PLUMBING INC 52$10M
18WISE BUILDING TECHNOLOGIES\, LLC 52$21M
19ELECTRICAL MASTERS INC 47$5M
20WORLDWIDE POOLS OF FL CORP 47$2M
04What Is Being Builtwork mix

Seven jobs in ten are renovation.

70% of classified permits touch a building that already stands; new construction is 26%. New builds carry 73% of the declared value.

Work category

H1 2026 · share of classified permits
  • New construction5,389 26%$7.23B
  • Renovation / alteration14,417 70%$2.59B
  • Demolition675 3%$58M

Permit type as the city files it

H1 2026 · top 6 by count
Permit type table
TypePermitsValue
ALTER - INTERIOR6,157$1.37B
NEW5,389$7.23B
ALTER - EXTERIOR4,754$933M
ADDITION - DETACHED2,198$123M
ADDITION - ATTACHED1,308$171M
DEMOLISH675$58M
05The Biggest Jobsby stated cost

The ten largest jobs of the half.

Ranked by the construction cost stated on the permit, after the value screen described in the methodology. These are single permits, not whole developments — a tower can appear as several.

The ten largest permits of the half

Stated construction cost · hover a bar for the job
#WorkApplicantStated cost
1Residential bldgOWNER$264.0M
2Site access planJC & ASSOCIATES GROUP INC$250.0M
3New constructionLEMARTEC CORPORATION$225.0M
4New constructionCOASTAL CONSTRUCTION OF MIAMI DADE COU$222.0M
5Commercial offuceMOSS & ASSOCIATES LLC$193.0M
6New constructionW PROJECTS CONSULTING LLC$164.0M
7New construction muKAST CONSTRUCTION COMPANY FLORIDA LLC$160.0M
8Pavement/dainageCENTRAL CIVIL CONSTRUCTION CO$112.0M
9Water mainOWNER$97.9M
10Site plansOWNER$97.9M
06How This Market ComparesH1 2026, all tracked cities

The same half, in every market Builtie tracks.

Permit counts are directly comparable. Dollar figures are not fully comparable across borders and jurisdictions — each city defines "construction value" its own way, and the coverage column shows how many of its permits state one at all. A market is marked withheld where that share is too low to stand behind.

Permits issued, H1 2026

10 markets · this report highlighted
MarketPermitsYoYScreened valueAvg per costed permitCost coverage
New York53,624n/a$17.14B$376K85%
Miamithis report20,481+0%$9.88B$495K97.4%
Toronto15,118+67%$5.94B$1.1M34.6%
Austin14,915-2%withheldn/a7%
Calgary9,603-14%$2.93B$333K91.6%
Nashville4,287-1%$1.69B$394K100%
Chicago3,667-1%$4.88B$1.3M100%
Seattle3,011-1%$1.80B$604K99.1%
Hamilton2,337-7%$897M$405K94.7%
Vancouver2,036-9%$3.11B$1.6M98.2%
07Methodologyand what we could not measure

What is behind every number above.

A report is only worth the disclosure attached to it. This is the whole of it.

How the figures are built

definitions
Source
Miami's own published building-permit record, ingested into the Builtie platform and read live from it. No third-party estimate is mixed in.
Period
Permits issued between January 1, 2026 and June 30, 2026. Applications and cancellations are excluded.
Declared value
The construction cost stated by the applicant on the permit. It is not a contract value, and it excludes land and soft costs. 19,956 of 20,481 permits (97.4%) state one; the rest contribute to the count and not to the value.
The value screen
Two classes of bad value are removed before any total: any single permit at or above $1,000,000,000, and any value at or above $10,000,000 that repeats on five or more permits in the same city — a parent project total stamped onto its sub-permits, which would otherwise be counted once per sub-permit. 241 Miami permits were screened out this half. A percentile trim was tested and rejected: it cannot tell a corrupt value from a genuine large tower.
Rounding
Values are rounded to the nearest million before display; shares are rounded to the nearest whole per cent, so columns may not sum to exactly 100.

What this page does not tell you

known gaps, stated on purpose
No approval timeline
This feed sets the application date equal to the issue date on every row, so we cannot say how long Miami takes to approve a permit. The field is 100% populated, which is exactly why it is easy to mistake for real: it is a placeholder, and a "same-day approval" chart drawn from it would be a fabrication. The GTA report carries this section because Toronto publishes a genuine application date.
No density map
No permit in the half carries coordinates. Addresses are present; geocoding them is queued work.