10800 Frazier Pike, Little Rock: Industrial Building

Industrial Building at 10800 Frazier Pike, Little Rock was permitted on April 8, 2026 with a stated construction value of $100M to $250M. LSAW Coating Mill pipe manufacturing - Industrial Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 10800 Frazier Pike, Little Rock |
| Project | Industrial Building |
| Building type | Commercial |
| Work | New building |
| Permit issued | April 8, 2026 |
| Stated construction value | $100M to $250M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “LSAW Coating Mill pipe manufacturing - Industrial”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Little Rock
- 338 Pleasant Valley Dr: Industrial Building
- 4500 Riverport Rd: School
- 7001 Zeuber Rd: Commercial Project Renovation
- 9301 Frazier Pike: Industrial Building
- 1 Airport Rd: Industrial Building
All of them: major construction projects in Little Rock. The data is Little Rock's own building permits. Neighbouring cities issue their own permits and are not in this count. North Little Rock and Conway have their own feeds.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 10800 Frazier Pike?
Industrial Building. LSAW Coating Mill pipe manufacturing - Industrial
When was the permit issued for 10800 Frazier Pike?
April 8, 2026, by the City of Little Rock.
Who is building 10800 Frazier Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 10800 Frazier Pike need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
