Construction Leads for Subcontractors

Workers tying rebar on a concrete deck at a construction site
The bid you never received is invisible. That is the problem worth solving first.

Most software sold to subcontractors helps you handle the invitations you already receive. That is useful once they arrive. It does nothing about the ones that never do, and the invitation you never got is the one you cannot see. Builtie works on that missing half: it finds permitted projects before the general contractor has drawn up the invitation list, names the estimator or project manager who writes it, and sends your introduction from your own LinkedIn and email, alongside whatever bid software you already use.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The two problems, and which one you actually have

SymptomThe real problemWhat fixes it
Too many invitations to price properlyBid throughputA bid board or estimating workflow
Invitations only from the same three contractorsPipeline concentrationReaching contractors who do not know you
Losing bids you were invited toPricing or presentationEstimating discipline, not more leads
Finding out about jobs after they are awardedTimingSeeing projects before the package goes out
No invitations in a new territory or project typeBeing unknownIntroductions before the list is drawn

Only two of those five are a lead problem. If your inbox is full and your win rate is the issue, better software for reading invitations will help you more than anything on this page. If the invitations are not arriving, no amount of bid management fixes it, because the constraint sits earlier: the person building the list did not think of you.

Where bid lists actually come from

How a subcontractor ends up on a bid list 1 A project enters the record Planning application, site plan or permit, months before any tender 2 A general contractor is appointed And starts thinking about which trades they will need 3 The list is drawn from memory and habit Firms they have used, firms they were introduced to 4 Invitations go out This is where bid software starts, and where your chance ends 5 Bids are compared Price matters here; being on the list mattered earlier

Four of these five steps happen before the first invitation is sent.

What Builtie does for a subcontractor

  • Finds the projects early. Drawn from permits, planning records and construction activity across markets in the United States and Canada, so a project is visible while the general contractor is still deciding who to involve.
  • Scores them against your trade. Your discipline, your project types, your territory and the build stage at which your package is decided, so the feed is jobs you could realistically win.
  • Names the person who writes the list. Traced past permit applicants, agents and numbered companies to the operating company, and to the project manager or estimator inside it, with email, phone and LinkedIn where each can be verified.
  • Runs the introduction. Done-for-you LinkedIn and email from your own accounts, drafted from the project record so the first line names their job rather than describing your company.

What Builtie is not

It is not a bid board, an estimating package or a takeoff tool, and it does not try to be. Those are separate jobs done well by separate products, and a subcontractor who is drowning in invitations should buy one of those instead. Builtie sits before all of them, at the point where a contractor decides whom to ask.

The numbers behind the feed

What Builtie tracks Permits since January 2024 1,024,996 across ten metros Companies tracked 70,167 Companies with identified decision makers 19,036 Permits in Toronto history alone 225,161

Bar length is relative within this chart, not a comparison between different units.

A first message that gets a subcontractor on a list

Hi Reza, saw you have the Danforth project underway and another one permitted in Scarborough. We are an electrical contractor working in both areas with capacity next month. If you are still filling trades on either, we would like to price them and can send two references from similar buildings.
— Illustrative sample outreach message, Builtie

It asks for one specific thing, which is a place on a list rather than a meeting, and it names two real projects. A project manager can answer that in one line, which is precisely why they do.

Trades this works for

Every trade has its own buying window, and missing it is the most common reason a subcontractor never sees the invitation. Concrete is committed before the site is visibly dug, framing is booked while the foundation cures, roofing and cabinetry are decided during framing, and painting is awarded while drywall goes up. There is a guide for each trade, and a map of when each package is decided.

Builtie plans start at $79 per month per seat for 20 projects a month, and $99 for 50. Growth adds LinkedIn and email outreach you run from the platform; Starter does not include Outreach. Done-for-you — where Builtie's team runs the content, campaigns and replies for you — is the Custom plan. There is a 7-day free trial with 10 projects.

Which plan fits you?

Starter, $79 per seat per month (CAD). 20 matched projects a month, which is $3.95 for a fully worked project — the decision maker, their verified email, phone and LinkedIn, the site context and the opening script all included in the one credit. Credits reset each month, and you can top up with a credit pack any time. Sourcing that by hand runs about twenty minutes a project, so the plan buys back roughly seven hours a month. Pick it if you already have someone sending the messages and what you are short of is a qualified list. It does not include Outreach.

Growth, $99 per seat per month (CAD). Twenty dollars more buys two and a half times the projects — 50 a month, $1.98 each — plus the entire outreach layer: LinkedIn and email sequences, campaigns, the unified inbox, events and social signals. Anyone opening more than 20 projects a month is better off here on volume alone, before counting the ten to fifteen hours a week that automated follow-up gives back. Pick it if someone on your team will log in and run it.

Done-For-You, the Custom plan, from CAD $1,500 a month. Pick it when the honest answer to “who is going to run this?” is nobody. Builtie's team writes the content, runs your LinkedIn, Instagram and email, answers the comments and DMs, builds and manages the campaigns, A/B tests the messaging, analyzes your followers and your competitors, and hands you the conversations. It sits on top of a Growth seat and is quoted against your trade, territory and channels. See everything Done-For-You covers, or compare all three on the pricing page.

See also: Construction leads for electricians (US), Construction leads for plumbers (US), Construction leads for HVAC contractors (US), Construction leads for drywall contractors (US), Construction leads for flooring contractors (US).

Frequently asked questions

How do subcontractors get more bid invitations?

By being known to the contractors who build the lists, before they build them. Bid lists are assembled from firms a general contractor already trusts or was recently introduced to, so the work is reaching the project manager or estimator while the project is still early, not answering faster once the invitation arrives.

Is Builtie a bid board?

No. A bid board manages the invitations you already receive. Builtie finds projects before the invitations exist, identifies the person who decides who gets invited, and runs the introduction. Plenty of subcontractors use both, because they solve different halves of the same problem.

Does Builtie include takeoff or estimating tools?

No, and it is not trying to. Takeoff and estimating are separate products done well by other vendors. Builtie covers the step before them: which projects exist, which suit your trade, and who awards the package.

How far ahead can a subcontractor see a project?

Projects appear when they enter the permit or planning record, typically weeks to months before the trade package is decided and long before a tender. How far ahead is useful depends on your trade: concrete needs the earliest warning, painting the least.

What does it cost?

Starter is $79 per month per seat for 20 projects a month and Growth is $99 for 50, with LinkedIn and email outreach on Growth and done-for-you on the Custom plan, with a 7-day free trial covering 10 projects.