1331 S Wells St, Chicago: 4-Storey Institutional Project

4-Storey Institutional Project at 1331 S Wells St, Chicago was permitted on June 3, 2026 with a stated construction value of $100M to $250M. Superstructure only permit for a proposed 4-story stadium with no basement on piles. piles only permit under 101075594, shallow foundations permit under 101079463. (occ groups a-2, a-3, a-5, b, s-1, s-2, f-1, m; construction type ib) consultant reviewer:… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1331 S Wells St, Chicago |
| Project | 4-Storey Institutional Project |
| Building type | Institutional |
| Work | New building |
| Permit issued | June 3, 2026 |
| Stated construction value | $100M to $250M |
| Estimated stage | Foundation |
| Company named on the permit | Chicago Fire Stadium LLC |
| Decision makers and contacts | In Builtie |
From the permit: “Superstructure only permit for a proposed 4-story stadium with no basement on piles. piles only permit under 101075594, shallow foundations permit under 101079463. (occ groups a-2, a-3, a-5, b, s-1, s-2, f-1, m; construction type ib) consultant reviewer:…”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 349 N Pulaski Rd: Office and Tenant Fit-Out
- 3733 E 87th St: Office and Tenant Fit-Out
- 4443 S Western Blvd: Commercial Project
- 171 N La Salle St: Office and Tenant Fit-Out
- 710 N Fairbanks Ct: Office and Tenant Fit-Out
All of them: major construction projects in Chicago. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1331 S Wells St?
4-Storey Institutional Project. Superstructure only permit for a proposed 4-story stadium with no basement on piles. piles only permit under 101075594, shallow foundations permit under 101079463. (occ groups a-2, a-3, a-5, b, s-1, s-2, f-1, m; construction type ib) consultant reviewer:…
When was the permit issued for 1331 S Wells St?
June 3, 2026, by the City of Chicago.
Who is building 1331 S Wells St?
Chicago Fire Stadium LLC is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1331 S Wells St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
