1628 W Division St, Chicago: 13-Storey Apartment Building

13-Storey Apartment Building at 1628 W Division St, Chicago was permitted on April 9, 2026 with a stated construction value of $25M to $50M. Dds cbc 2019 full building permit for 13-story building with 121 dwelling units and first floor garage.. sprinkler system under seperate permit. (occupancy group r-2; type 1a construction) consultant reviewer: v3 companies of il Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1628 W Division St, Chicago |
| Project | 13-Storey Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | April 9, 2026 |
| Stated construction value | $25M to $50M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Dds cbc 2019 full building permit for 13-story building with 121 dwelling units and first floor garage.. sprinkler system under seperate permit. (occupancy group r-2; type 1a construction) consultant reviewer: v3 companies of il”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 955 N Larrabee St: 7-Storey Apartment Building
- 1400 W 44th St: Warehouse Renovation
- 2233 S Dr Martin L King Jr Dr: Hotel Renovation
- 251 E Huron St: Office and Tenant Fit-Out
- 566 W Van Buren St: 12-Storey Apartment Building
All of them: major construction projects in Chicago. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1628 W Division St?
13-Storey Apartment Building. Dds cbc 2019 full building permit for 13-story building with 121 dwelling units and first floor garage.. sprinkler system under seperate permit. (occupancy group r-2; type 1a construction) consultant reviewer: v3 companies of il
When was the permit issued for 1628 W Division St?
April 9, 2026, by the City of Chicago.
Who is building 1628 W Division St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1628 W Division St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
