1819 E Belmont Cir, Nashville: Institutional Project Renovation

Institutional Project Renovation at 1819 E Belmont Cir, Nashville was permitted on July 8, 2026 with a stated construction value of $10M to $25M. The project consists includes the renovation of the existing Belmont Powerhouse Building into a venue space featuring open seating and a performance stage. Additionally, the project includes the construction of a new four-story facility comprising food… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1819 E Belmont Cir, Nashville |
| Project | Institutional Project Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | July 8, 2026 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “The project consists includes the renovation of the existing Belmont Powerhouse Building into a venue space featuring open seating and a performance stage. Additionally, the project includes the construction of a new four-story facility comprising food…”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 3319 West End Ave: Office and Tenant Fit-Out
- 1215 21st Ave S: Office and Tenant Fit-Out
- 5010 C Tennessee Ave: Parking Structure
- 2410 Patterson St: Healthcare Building Renovation
- 92 White Bridge Pike: Apartment Building Renovation
All of them: major construction projects in Nashville. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1819 E Belmont Cir?
Institutional Project Renovation. The project consists includes the renovation of the existing Belmont Powerhouse Building into a venue space featuring open seating and a performance stage. Additionally, the project includes the construction of a new four-story facility comprising food…
When was the permit issued for 1819 E Belmont Cir?
July 8, 2026, by Metro Nashville and Davidson County.
Who is building 1819 E Belmont Cir?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1819 E Belmont Cir need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
