365 Riverbend Dr, Kitchener: Transit Facility

Transit Facility at 365 Riverbend Dr, Kitchener was permitted on February 23, 2026 with a stated construction value of $10M to $25M. Utility Building (Hydro, Water, Sewage, Gas etc) - Permit is for a new Spring Valley Wastewater Pumping Station, existing station to remain Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 365 Riverbend Dr, Kitchener |
| Project | Transit Facility |
| Building type | Commercial |
| Work | New building |
| Permit issued | February 23, 2026 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Utility Building (Hydro, Water, Sewage, Gas etc) - Permit is for a new Spring Valley Wastewater Pumping Station, existing station to remain”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Kitchener
- 3241 King St E: Apartment Building Renovation
- 124 WOOLWICH ST - Block B: Townhomes
- 124 WOOLWICH ST - Block A: Townhomes
- 360 Shirley Ave: Commercial Project
- 210 Duke St E: Affordable Housing
All of them: major construction projects in Kitchener. The data is Kitchener's own building permits. Neighbouring cities issue their own permits and are not in this count. Waterloo and Cambridge issue their own permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 365 Riverbend Dr?
Transit Facility. Utility Building (Hydro, Water, Sewage, Gas etc) - Permit is for a new Spring Valley Wastewater Pumping Station, existing station to remain
When was the permit issued for 365 Riverbend Dr?
February 23, 2026, by the City of Kitchener.
Who is building 365 Riverbend Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 365 Riverbend Dr need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
