5415 S Shackleford Rd, Little Rock: Transit Facility

Transit Facility at 5415 S Shackleford Rd, Little Rock was permitted on October 30, 2025 with a stated construction value of $25M to $50M. SPLITTING PERMIT 202515296 PHASE 1 BUILDING CORIG SUBMITTED AS New Facility JA Riggs engine equipment rebuilds - Service Stations and Repair Garage Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 5415 S Shackleford Rd, Little Rock |
| Project | Transit Facility |
| Building type | Commercial |
| Work | New building |
| Permit issued | October 30, 2025 |
| Stated construction value | $25M to $50M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “SPLITTING PERMIT 202515296 PHASE 1 BUILDING CORIG SUBMITTED AS New Facility JA Riggs engine equipment rebuilds - Service Stations and Repair Garage”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Little Rock
- 6301 District Ave: 3-Storey Healthcare Building
- 21501 Highway 10: School
- 1200 President Clinton Ave: Commercial Project Renovation
- 1 Airport Rd: Industrial Building
- 8 Electric Ave: Campus Building
All of them: major construction projects in Little Rock. The data is Little Rock's own building permits. Neighbouring cities issue their own permits and are not in this count. North Little Rock and Conway have their own feeds.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 5415 S Shackleford Rd?
Transit Facility. SPLITTING PERMIT 202515296 PHASE 1 BUILDING CORIG SUBMITTED AS New Facility JA Riggs engine equipment rebuilds - Service Stations and Repair Garage
When was the permit issued for 5415 S Shackleford Rd?
October 30, 2025, by the City of Little Rock.
Who is building 5415 S Shackleford Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 5415 S Shackleford Rd need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
