955 Oliver Rd, Thunder Bay: Retail Building

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

Retail Building at 955 Oliver Rd, Thunder Bay was permitted on August 22, 2025 with a stated construction value of $10M to $25M. Institutional Accessory Building - Construct a 1 Storey Animal Education Facility Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address955 Oliver Rd, Thunder Bay
ProjectRetail Building
Building typeInstitutional
WorkNew building
Permit issuedAugust 22, 2025
Stated construction value$10M to $25M
Estimated stageFraming
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Institutional Accessory Building - Construct a 1 Storey Animal Education Facility”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Thunder Bay

All of them: major construction projects in Thunder Bay. The data is Thunder Bay's own building permits. Neighbouring cities issue their own permits and are not in this count.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 955 Oliver Rd?

Retail Building. Institutional Accessory Building - Construct a 1 Storey Animal Education Facility

When was the permit issued for 955 Oliver Rd?

August 22, 2025, by the City of Thunder Bay.

Who is building 955 Oliver Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 955 Oliver Rd need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.