Finish Carpentry Construction Leads by City (2026): 38,417 Projects in 25 Markets

A contractor cutting lumber with a circular saw
Live figures read October 9, 2026. Builtie construction intelligence content.

On October 9, 2026, Builtie counted 38,417 finish carpentry projects still inside the finish carpentry award window across 25 markets in the United States and Canada. New York City leads with 16,573. The builder or general contractor awards trim, doors and finish carpentry once drywall is scheduled; on custom homes the designer often specifies the profiles.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Open finish carpentry projects in every market Builtie covers

MarketState or provinceProjects in the award windowPermitted in the last 90 days
New York CityNew York16,5731,754
AustinTexas7,470399
Miami-DadeFlorida3,514353
CalgaryAlberta2,142242
Los AngelesCalifornia1,92683
TorontoOntario1,69273
NashvilleTennessee1,128177
ChicagoIllinois989101
VancouverBritish Columbia60452
SeattleWashington59670
San AntonioTexas3829
Fort WorthTexas2988
KitchenerOntario15124
AirdrieAlberta15119
Fayetteville, ArkansasArkansas1325
TulsaOklahoma1177
Overland ParkKansas1115
Little RockArkansas1105
Grande PrairieAlberta10113
Windsor, OntarioOntario662
Thunder BayOntario561
Broken ArrowOklahoma380
North Little RockArkansas341
Red DeerAlberta276
St. LouisMissouri9

Across the 25 markets, 38,417 finish carpentry projects were inside the award window on October 9, 2026: 33,427 in the United States and 4,990 in Canada, 3,418 of them permitted in the last 90 days. Each market counts its own city's permits only, so a large count says as much about how much a city publishes as about how much it builds.

Finish Carpentry: projects in the award window, by market New York City 16,573 Austin 7,470 Miami-Dade 3,514 Calgary 2,142 Los Angeles 1,926 Toronto 1,692 Nashville 1,128 Chicago 989 Vancouver 604 Seattle 596 San Antonio 382 Fort Worth 298

The twelve largest of 25 markets, read October 9, 2026.

When finish carpentry is awarded, and who decides

Builtie times finish carpentry from about 55% of the way through the build to about 75%, with the last realistic approach at about 85%. The builder or general contractor awards trim, doors and finish carpentry once drywall is scheduled; on custom homes the designer often specifies the profiles.

Tap a stage. The highlighted stage is where finish carpentry is typically awarded.

What to lead with: crew availability for the finishing weeks, trim and door packages, and references from similar homes.

Running the pipeline

Finish Carpentry work comes in waves that follow the permit record, so the pipeline that wins it starts from projects, not from a contact list. Track each project's stage, call the builder when it enters the window, and keep the drywall completion date, the trim package and the punch-list date in the record. CRM for finish carpenters covers what to look for in a CRM built around that.

More: construction leads for subcontractors, and every market and trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

Where are the most finish carpentry construction leads in North America?

Among the markets Builtie covers, on October 9, 2026: New York City, 16,573 projects; Austin, 7,470 projects; Miami-Dade, 3,514 projects; Calgary, 2,142 projects; Los Angeles, 1,926 projects.

When should finish carpenters contact builders?

Builtie times finish carpentry from about 55% of the way through the build to about 75%, with the last realistic approach at about 85%.

Who decides on finish carpentry for a new building?

The builder or general contractor awards trim, doors and finish carpentry once drywall is scheduled; on custom homes the designer often specifies the profiles.

How are these finish carpentry projects counted?

A project counts when its permit was issued in the last four years, the build is still inside the finish carpentry award window and the job is at least $4k of finish carpentry work. Trade sub-permits are grouped into their parent project.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.