Low Voltage and Data Construction Leads in Windsor, Ontario (2026): 108 Projects in the Award Window

To find low-voltage construction leads in Windsor, Ontario, work from building permits and time the call to the build stage. On October 9, 2026, 108 permitted projects in the City of Windsor were still at the point where low-voltage is awarded. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many low-voltage projects are open in Windsor, Ontario right now
| Measure | Windsor, Ontario |
|---|---|
| Projects in the low-voltage award window | 108 |
| New buildings / renovations and alterations | 63 / 45 |
| Permitted in the last 90 days | 38 |
| Median declared construction value | $731,102 (CAD) |
| Rank among 25 markets for low-voltage | 20 of 25 |
| Newest permit in the Windsor, Ontario feed |
58% of them are new buildings and 42% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. 38 of them (35%) were permitted in the last 90 days. Windsor, Ontario ranks 20 of 25 markets Builtie covers for low-voltage, behind Grande Prairie (120 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when low-voltage is awarded, and the job is big enough to be worth quoting: at least $4k of low-voltage work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Windsor, Ontario.
When low-voltage is awarded, and who decides
Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.
Tap a stage. The highlighted stage is where low-voltage is typically awarded.
What to lead with when you call a builder in Windsor: structured cabling, security and access-control integration, and coordination with the electrical rough-in.
What the Windsor, Ontario data covers
The data is Windsor's own building permits. Neighbouring cities issue their own permits and are not in this count. Windsor publishes its permits with a delay; the newest permit in the feed on the read date was issued August 28, 2026.
Trades bought around the same stage in Windsor
| Trade | Projects in the award window | Award window |
|---|---|---|
| Drywall leads in Windsor | 112 | 35% to 60% |
| Signage and Wayfinding leads in Windsor | 48 | 25% to 70% |
| Insulation leads in Windsor | 92 | 30% to 55% |
| Tile leads in Windsor | 73 | 45% to 65% |
| Fire Protection leads in Windsor | 79 | 25% to 50% |
| Cabinetry and Millwork leads in Windsor | 71 | 50% to 70% |
Every trade in Windsor: Windsor construction leads by trade. Every market for low-voltage: Low Voltage and Data construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find low-voltage construction leads in Windsor, Ontario?
Start from building permits, not bid boards: most private low-voltage work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Windsor's permits, keeps the projects still inside the low-voltage award window (108 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should low-voltage and data contractors contact a builder in Windsor?
Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards low-voltage work on new construction in Windsor?
The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.
How many low-voltage projects does Builtie track in Windsor, Ontario?
108 projects were inside the low-voltage award window on October 9, 2026: 63 new buildings and 45 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.