1080 Gore Avenue, Vancouver: Healthcare Building

Healthcare Building at 1080 Gore Avenue, Vancouver was permitted on July 7, 2025 with a stated construction value of over $250M. New Building - Providence Health Care (PHC) to construct a thirteen-storey reinforced concrete Clinical Support & Research Centre (CSRC) atop four levels of underground parking with a pedestrian connection to the New St. Paul's Hospital (NSPH) on Level 7 and… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1080 Gore Avenue, Vancouver |
| Project | Healthcare Building |
| Building type | Institutional |
| Work | New building |
| Permit issued | July 7, 2025 |
| Stated construction value | over $250M |
| Estimated stage | Framing |
| Company named on the permit | David Steer DBA: LMDG Building Code Consultants Ltd. |
| Decision makers and contacts | In Builtie |
From the permit: “New Building - Providence Health Care (PHC) to construct a thirteen-storey reinforced concrete Clinical Support & Research Centre (CSRC) atop four levels of underground parking with a pedestrian connection to the New St. Paul's Hospital (NSPH) on Level 7 and…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 9010 Laurel Street: Transit Facility
- 8433 Ash Street: Mixed-Use Building
- 750 W 32nd Avenue: 13-Storey Long-Term Care Home
- 1010 Expo Boulevard: 29-Storey Apartment Building
- 2090 W Broadway: 31-Storey Mixed-Use Building
All of them: major construction projects in Vancouver. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1080 Gore Avenue?
Healthcare Building. New Building - Providence Health Care (PHC) to construct a thirteen-storey reinforced concrete Clinical Support & Research Centre (CSRC) atop four levels of underground parking with a pedestrian connection to the New St. Paul's Hospital (NSPH) on Level 7 and…
When was the permit issued for 1080 Gore Avenue?
July 7, 2025, by the City of Vancouver.
Who is building 1080 Gore Avenue?
David Steer DBA: LMDG Building Code Consultants Ltd. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1080 Gore Avenue need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
