121 Shorncliffe Rd, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 121 Shorncliffe Rd, Toronto was permitted on August 27, 2026 with a stated construction value of $10M to $25M. Proposal to add third and fourth floors and interior alterations to restore building systems and floor layout Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 121 Shorncliffe Rd, Toronto |
| Project | Office and Tenant Fit-Out |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | August 27, 2026 |
| Stated construction value | $10M to $25M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to add third and fourth floors and interior alterations to restore building systems and floor layout”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 10 R Ordnance St: Transit Facility
- 1901 Mount Pleasant Rd: Restaurant Renovation
- 23 George St: School
- 85 Carmichael Ave: School Renovation
- 95 Wellington St W: Office and Tenant Fit-Out
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 121 Shorncliffe Rd?
Office and Tenant Fit-Out. Proposal to add third and fourth floors and interior alterations to restore building systems and floor layout
When was the permit issued for 121 Shorncliffe Rd?
August 27, 2026, by the City of Toronto.
Who is building 121 Shorncliffe Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 121 Shorncliffe Rd need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
