1221 Stevenson Center Ln, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 1221 Stevenson Center Ln, Nashville was permitted on September 29, 2026 with a stated construction value of $50M to $100M. THE BUILDING IS HIGH-RISE, TYPE 1B CONSTRUCTION, RESEARCH FACILITY DESIGNED TO ACCOMMODATE A DIVERSE RANGE OF LABORATORY ENVIRONMENTS. THE FACILITY ENCOMPASSES APPROXIMATELY 210,000 GROSS SQUARE FEET, WITH TWO LEVELS BELOW GRADE, EIGHT LEVELS ABOVE GRADE, AND… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1221 Stevenson Center Ln, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | New building |
| Permit issued | September 29, 2026 |
| Stated construction value | $50M to $100M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “THE BUILDING IS HIGH-RISE, TYPE 1B CONSTRUCTION, RESEARCH FACILITY DESIGNED TO ACCOMMODATE A DIVERSE RANGE OF LABORATORY ENVIRONMENTS. THE FACILITY ENCOMPASSES APPROXIMATELY 210,000 GROSS SQUARE FEET, WITH TWO LEVELS BELOW GRADE, EIGHT LEVELS ABOVE GRADE, AND…”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 719 Thompson Ln 20: Commercial Project Renovation
- 2800 Opryland Dr: Hotel Renovation
- 1401 Church St: 26-Storey Apartment Building
- 1221 Grundy St: Hotel
- 611 Cowan St: 17-Storey Hotel
All of them: major construction projects in Nashville. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1221 Stevenson Center Ln?
Office and Tenant Fit-Out. THE BUILDING IS HIGH-RISE, TYPE 1B CONSTRUCTION, RESEARCH FACILITY DESIGNED TO ACCOMMODATE A DIVERSE RANGE OF LABORATORY ENVIRONMENTS. THE FACILITY ENCOMPASSES APPROXIMATELY 210,000 GROSS SQUARE FEET, WITH TWO LEVELS BELOW GRADE, EIGHT LEVELS ABOVE GRADE, AND…
When was the permit issued for 1221 Stevenson Center Ln?
September 29, 2026, by Metro Nashville and Davidson County.
Who is building 1221 Stevenson Center Ln?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1221 Stevenson Center Ln need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
