2800 Opryland Dr, Nashville: Hotel Renovation

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

Hotel Renovation at 2800 Opryland Dr, Nashville was permitted on August 13, 2025 with a stated construction value of $25M to $50M. To construct two level addition which also contains 2 mezzanine levels for existing tenant; GAYLORD OPRYLAND RESORT AND CONVENTION CENTER (hotel). MEETING & BALLROOM EXPANSION. No increase to number of rooming units. Must comply with 17.12.020.C. CA… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address2800 Opryland Dr, Nashville
ProjectHotel Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedAugust 13, 2025
Stated construction value$25M to $50M
Estimated stageFraming
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “To construct two level addition which also contains 2 mezzanine levels for existing tenant; GAYLORD OPRYLAND RESORT AND CONVENTION CENTER (hotel). MEETING & BALLROOM EXPANSION. No increase to number of rooming units. Must comply with 17.12.020.C. CA…”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Nashville

All of them: major construction projects in Nashville. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 2800 Opryland Dr?

Hotel Renovation. To construct two level addition which also contains 2 mezzanine levels for existing tenant; GAYLORD OPRYLAND RESORT AND CONVENTION CENTER (hotel). MEETING & BALLROOM EXPANSION. No increase to number of rooming units. Must comply with 17.12.020.C. CA…

When was the permit issued for 2800 Opryland Dr?

August 13, 2025, by Metro Nashville and Davidson County.

Who is building 2800 Opryland Dr?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 2800 Opryland Dr need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.