12232 Metcalf Ave, Overland Park: Commercial Project

Commercial Project at 12232 Metcalf Ave, Overland Park was permitted on August 20, 2026 with a stated construction value of $5M to $10M. Costco Gas (REZ2025-00010) - Costco Fuel Facility Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 12232 Metcalf Ave, Overland Park |
| Project | Commercial Project |
| Building type | Commercial |
| Work | New building |
| Permit issued | August 20, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Costco Gas (REZ2025-00010) - Costco Fuel Facility”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Overland Park
- 6590 W 112th Ter: Apartment Building
- 6380 W 112th Ter: Apartment Building
- 6530 W 112th Ter: Apartment Building
- 6640 W 112th Ter: Apartment Building
- 7820 W 161st St: Retail Building
All of them: major construction projects in Overland Park. The data is Overland Park's own building permits. Neighbouring cities issue their own permits and are not in this count. Olathe, Lenexa and Kansas City issue their own permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 12232 Metcalf Ave?
Commercial Project. Costco Gas (REZ2025-00010) - Costco Fuel Facility
When was the permit issued for 12232 Metcalf Ave?
August 20, 2026, by the City of Overland Park.
Who is building 12232 Metcalf Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 12232 Metcalf Ave need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
