Waterproofing Construction Leads in Overland Park (2026): 120 Projects in the Award Window

To find waterproofing construction leads in Overland Park, work from building permits and time the call to the build stage. On October 9, 2026, 120 permitted projects in the City of Overland Park were still at the point where waterproofing is awarded. The general contractor awards waterproofing around the foundation and the building envelope; an envelope consultant or the architect often specifies the system. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many waterproofing projects are open in Overland Park right now
| Measure | Overland Park |
|---|---|
| Projects in the waterproofing award window | 120 |
| New buildings / renovations and alterations | 69 / 51 |
| Permitted in the last 90 days | 93 |
| Median declared construction value | $554,329 |
| Rank among 25 markets for waterproofing | 17 of 25 |
| Newest permit in the Overland Park feed | October 6, 2026 |
58% of them are new buildings and 42% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. Because waterproofing is bought early, the 93 projects permitted in the last 90 days are the ones to call first; 78% of the count is that recent. Overland Park ranks 17 of 25 markets Builtie covers for waterproofing, behind Fayetteville, Arkansas (135 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when waterproofing is awarded, and the job is big enough to be worth quoting: at least $8k of waterproofing work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Overland Park.
When waterproofing is awarded, and who decides
Builtie times waterproofing from about 10% of the way through the build to about 35%, with the last realistic approach at about 45%. The general contractor awards waterproofing around the foundation and the building envelope; an envelope consultant or the architect often specifies the system.
Tap a stage. The highlighted stage is where waterproofing is typically awarded.
What to lead with when you call a builder in Overland Park: below-grade and envelope systems, warranty terms and inspection coordination.
What the Overland Park data covers
The data is Overland Park's own building permits. Neighbouring cities issue their own permits and are not in this count. Olathe, Lenexa and Kansas City issue their own permits.
If you work from Olathe, Lenexa, Leawood and Kansas City, Kansas, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.
Trades bought around the same stage in Overland Park
| Trade | Projects in the award window | Award window |
|---|---|---|
| Masonry leads in Overland Park | 115 | 10% to 30% |
| Painting leads in Overland Park | 172 | 5% to 35% |
| Roofing leads in Overland Park | 130 | 15% to 35% |
| Windows, Doors and Glazing leads in Overland Park | 134 | 15% to 35% |
| Electrical leads in Overland Park | 179 | 20% to 45% |
| HVAC and Mechanical leads in Overland Park | 179 | 20% to 45% |
Every trade in Overland Park: Overland Park construction leads by trade. Every market for waterproofing: Waterproofing construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find waterproofing construction leads in Overland Park?
Start from building permits, not bid boards: most private waterproofing work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Overland Park's permits, keeps the projects still inside the waterproofing award window (120 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should waterproofing contractors contact a builder in Overland Park?
Builtie times waterproofing from about 10% of the way through the build to about 35%, with the last realistic approach at about 45%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards waterproofing work on new construction in Overland Park?
The general contractor awards waterproofing around the foundation and the building envelope; an envelope consultant or the architect often specifies the system.
How many waterproofing projects does Builtie track in Overland Park?
120 projects were inside the waterproofing award window on October 9, 2026: 69 new buildings and 51 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
