20 Brow Dr, Toronto: Transit Facility

Transit Facility at 20 Brow Dr, Toronto was permitted on January 6, 2026 with a stated construction value of $50M to $100M. Part of the Lakeshore West Metrolinx project. Two new above grade Long Branch GO Station Entrance Buildings, New tunnels, Platforms, and parking lot rehabilitation Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 20 Brow Dr, Toronto |
| Project | Transit Facility |
| Building type | Institutional |
| Work | New building |
| Permit issued | January 6, 2026 |
| Stated construction value | $50M to $100M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Part of the Lakeshore West Metrolinx project. Two new above grade Long Branch GO Station Entrance Buildings, New tunnels, Platforms, and parking lot rehabilitation”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 908 St Clair Ave W: 13-Storey Mixed-Use Building
- 63 Montclair Ave: 19-Storey Apartment Building
- 33 Chatsworth Dr: 4-Storey Apartment Building
- 900 Bay St: Office and Tenant Fit-Out
- 185 Eileen Ave: 3-Storey Townhomes
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 20 Brow Dr?
Transit Facility. Part of the Lakeshore West Metrolinx project. Two new above grade Long Branch GO Station Entrance Buildings, New tunnels, Platforms, and parking lot rehabilitation
When was the permit issued for 20 Brow Dr?
January 6, 2026, by the City of Toronto.
Who is building 20 Brow Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 20 Brow Dr need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.