200 Bay St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 200 Bay St, Toronto was permitted on July 23, 2026 with a stated construction value of $25M to $50M. Proposed interior alterations to existing offices on floors 14N, 15N, 15S, 18S Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 200 Bay St, Toronto |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | July 23, 2026 |
| Stated construction value | $25M to $50M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposed interior alterations to existing offices on floors 14N, 15N, 15S, 18S”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 406 Keele St: 6-Storey Condominium
- 198 New Toronto St: Warehouse Renovation
- 145 Baycrest Ave: School
- 1161 Kingston Rd: 8-Storey Mixed-Use Building
- 555 University Ave: Healthcare Building Renovation
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 200 Bay St?
Office and Tenant Fit-Out. Proposed interior alterations to existing offices on floors 14N, 15N, 15S, 18S
When was the permit issued for 200 Bay St?
July 23, 2026, by the City of Toronto.
Who is building 200 Bay St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 200 Bay St need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.