289 Balliol St, Toronto: 31-Storey Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 15, 2026 from Builtie's permit data.

31-Storey Apartment Building Renovation at 289 Balliol St, Toronto was permitted on August 12, 2025 with a stated construction value of $50M to $100M. Proposal for Geothermal installation for a proposed 31-storey residential buildingSee for future development Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address289 Balliol St, Toronto
NeighbourhoodSouth Eglinton-Davisville
Project31-Storey Apartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedAugust 12, 2025
Stated construction value$50M to $100M
Estimated stageFraming
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Proposal for Geothermal installation for a proposed 31-storey residential buildingSee for future development”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 289 Balliol St?

31-Storey Apartment Building Renovation. Proposal for Geothermal installation for a proposed 31-storey residential buildingSee for future development

When was the permit issued for 289 Balliol St?

August 12, 2025, by the City of Toronto.

Who is building 289 Balliol St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 289 Balliol St need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.