30 Bond St, Toronto: 2-Storey Healthcare Building Renovation

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

2-Storey Healthcare Building Renovation at 30 Bond St, Toronto was permitted on November 24, 2025 with a stated construction value of $10M to $25M. Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address30 Bond St, Toronto
NeighbourhoodDowntown Yonge East
Project2-Storey Healthcare Building Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedNovember 24, 2025
Stated construction value$10M to $25M
Estimated stageFoundation
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 30 Bond St?

2-Storey Healthcare Building Renovation. Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE

When was the permit issued for 30 Bond St?

November 24, 2025, by the City of Toronto.

Who is building 30 Bond St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 30 Bond St need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.