543 Mount Pleasant Rd, Toronto: Office-to-Residential Conversion

Stated value
under $1M
Permit issued
Jan 27, 2026
Stage (est.)
Framing
Building type
Commercial
Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office-to-Residential Conversion at 543 Mount Pleasant Rd, Toronto was permitted on January 27, 2026 with a stated construction value of under $1M. Proposed interior alterations to convert the existing furniture store to a new veterinary clinic, unit 543 & 545 (combined space). Builtie tracks the project's stage, the trades still being bought and the people who decide.

The project

Address543 Mount Pleasant Rd, Toronto
NeighbourhoodMount Pleasant East
ProjectOffice-to-Residential Conversion
Building typeCommercial
WorkRenovation or alteration
Permit issuedJanuary 27, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed interior alterations to convert the existing furniture store to a new veterinary clinic, unit 543 & 545 (combined space)”

Where this project is

  1. July 29, 2016Addition or alteration · under $1M
  2. January 27, 2026Addition or alteration: Office-to-Residential Conversion · under $1M (this page)
  3. January 27, 2026Drains and site services: interior alteration
  4. January 27, 2026Plumbing
  5. January 30, 2026Mechanical
  6. February 2026Estimated construction start (estimate)
  7. August 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 170 Roehampton AveNew building · over $250M · July 2026
  • 2200 Yonge StAddition or alteration: demolition · $50M to $100M · April 2026
  • 2180 Yonge StAddition or alteration: elevator · $25M to $50M · March 2026
  • 1951 Yonge StAddition or alteration: excavation and shoring · $1M to $5M · May 2026
  • 2190 Yonge StAddition or alteration: demolition · $1M to $5M · March 2026

11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Feb 2026 – Aug 2026Estimate
Construction Site SecurityFeb 2026 – Mar 2026Window passed (est.)
PaintingMar 2026 – May 2026Window passed (est.)
MasonryFeb 2026 – Mar 2026Window passed (est.)
WaterproofingFeb 2026 – Mar 2026Window passed (est.)
RoofingMar 2026 – Apr 2026Window passed (est.)
Windows, Doors and GlazingMar 2026 – Apr 2026Window passed (est.)
ElectricalMar 2026 – May 2026Window passed (est.)
HVAC and MechanicalMar 2026 – May 2026Window passed (est.)
PlumbingMar 2026 – May 2026Window passed (est.)
Fire ProtectionMar 2026 – May 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 543 Mount Pleasant Rd?

Office-to-Residential Conversion. Proposed interior alterations to convert the existing furniture store to a new veterinary clinic, unit 543 & 545 (combined space)

When was the permit issued for 543 Mount Pleasant Rd?

January 27, 2026, by the City of Toronto.

Who is building 543 Mount Pleasant Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 543 Mount Pleasant Rd need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.