60 Adelaide St E, Toronto: Office and Tenant Fit-Out

Stated value
under $1M
Permit issued
Jun 26, 2026
Stage (est.)
Foundation
Building type
Commercial
Street view near 60 Adelaide St E, Toronto
Street view near this address, photographed September 2019 before the permit. Photo: Oaktree b, CC BY-SA 4.0, via Wikimedia Commons. Figures read October 24, 2026 from Builtie's permit data.

More photos of this address 2

Office and Tenant Fit-Out at 60 Adelaide St E, Toronto was permitted on June 26, 2026 with a stated construction value of under $1M. Proposal for interior alterations to existing office. Builtie tracks the project's stage, the trades still being bought and the people who decide.

The project

Address60 Adelaide St E, Toronto
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedJune 26, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for interior alterations to existing office”

Where this project is

  1. Since December 201611 other permits at this address
  2. December 16, 2016Addition or alteration: demolition · under $1M
  3. November 19, 2024Addition or alteration: plumbing
  4. January 23, 2026Fire and life safety · under $1M
  5. June 2, 2026Addition or alteration: interior alteration · under $1M
  6. June 26, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  7. July 29, 2026Fire and life safety · under $1M
  8. July 2026Estimated construction start (estimate)
  9. January 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more renovations within 1 km

  • 8 Elm StNew building · over $250M · March 2026
  • 285 Queen St EConditional Permit · $100M to $250M · May 2026
  • 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
  • 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
  • 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026

68 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jul 2026 – Jan 2027Estimate
Construction Site SecurityJul 2026 – Aug 2026Window passed (est.)
Concrete and FoundationJul 2026 – Aug 2026Window passed (est.)
Structural SteelJul 2026 – Aug 2026Window passed (est.)
ElevatorsJul 2026 – Sep 2026Window passed (est.)
FramingJul 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Sep 2026Window passed (est.)
MasonryJul 2026 – Aug 2026Window passed (est.)
WaterproofingJul 2026 – Aug 2026Window passed (est.)
RoofingAug 2026 – Sep 2026Window passed (est.)
Windows, Doors and GlazingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 60 Adelaide St E?

Office and Tenant Fit-Out. Proposal for interior alterations to existing office

When was the permit issued for 60 Adelaide St E?

June 26, 2026, by the City of Toronto.

Who is building 60 Adelaide St E?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 60 Adelaide St E need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.