688 W 57th Avenue, Vancouver: 29-Storey Healthcare Building

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

29-Storey Healthcare Building at 688 W 57th Avenue, Vancouver was permitted on May 5, 2026 with a stated construction value of $50M to $100M. New Building - Parcel C of Phase 1 of the Pearson Dogwood redevelopment. To construct a 29 storey mixed-use building with 9-storey podium consisting of: Level 1 to 5 - Retail units, Health Care Office (Community Health Centre) incl. a Therapy pool at L2 Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address688 W 57th Avenue, Vancouver
Project29-Storey Healthcare Building
Building typeInstitutional
WorkNew building
Permit issuedMay 5, 2026
Stated construction value$50M to $100M
Estimated stageFoundation
Company named on the permitOnni Contracting Ltd
Decision makers and contactsIn Builtie

From the permit: “New Building - Parcel C of Phase 1 of the Pearson Dogwood redevelopment. To construct a 29 storey mixed-use building with 9-storey podium consisting of: Level 1 to 5 - Retail units, Health Care Office (Community Health Centre) incl. a Therapy pool at L2”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Vancouver

All of them: major construction projects in Vancouver. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 688 W 57th Avenue?

29-Storey Healthcare Building. New Building - Parcel C of Phase 1 of the Pearson Dogwood redevelopment. To construct a 29 storey mixed-use building with 9-storey podium consisting of: Level 1 to 5 - Retail units, Health Care Office (Community Health Centre) incl. a Therapy pool at L2

When was the permit issued for 688 W 57th Avenue?

May 5, 2026, by the City of Vancouver.

Who is building 688 W 57th Avenue?

Onni Contracting Ltd is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 688 W 57th Avenue need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.