790 Arthur St W, Thunder Bay: 6-Storey Hotel

6-Storey Hotel at 790 Arthur St W, Thunder Bay was permitted on May 27, 2026 with a stated construction value of $10M to $25M. Hotel - Construct a 6-storey 105 room hotel (Fairfield Inn and Suites) Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 790 Arthur St W, Thunder Bay |
| Project | 6-Storey Hotel |
| Building type | Commercial |
| Work | New building |
| Permit issued | May 27, 2026 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Hotel - Construct a 6-storey 105 room hotel (Fairfield Inn and Suites)”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Thunder Bay
- 820 Gordon St: 5-Storey Rental Building
- 1302 Jasper Dr: 5-Storey Rental Building
- 427 Balmoral St: 3-Storey Rental Building
- 1249 Innovation Dr: Office and Tenant Fit-Out
- 412 Aquamarine Dr: 3-Storey Rental Building
All of them: major construction projects in Thunder Bay. The data is Thunder Bay's own building permits. Neighbouring cities issue their own permits and are not in this count.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 790 Arthur St W?
6-Storey Hotel. Hotel - Construct a 6-storey 105 room hotel (Fairfield Inn and Suites)
When was the permit issued for 790 Arthur St W?
May 27, 2026, by the City of Thunder Bay.
Who is building 790 Arthur St W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 790 Arthur St W need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
