Masonry Construction Leads in Thunder Bay (2026): 70 Projects in the Award Window

To find masonry construction leads in Thunder Bay, work from building permits and time the call to the build stage. On October 9, 2026, 70 permitted projects in the City of Thunder Bay were still at the point where masonry is awarded. The builder or general contractor awards masonry early, around the structure, because brick and stone have long lead times and set the exterior schedule. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many masonry projects are open in Thunder Bay right now
| Measure | Thunder Bay |
|---|---|
| Projects in the masonry award window | 70 |
| New buildings / renovations and alterations | 55 / 15 |
| Permitted in the last 90 days | 51 |
| Median declared construction value | $1,000,000 (CAD) |
| Rank among 25 markets for masonry | 20 of 25 |
| Newest permit in the Thunder Bay feed | October 8, 2026 |
79% of them are new buildings and 21% are renovations, additions or alterations, so most of this work is awarded by builders and developers on ground-up projects. Because masonry is bought early, the 51 projects permitted in the last 90 days are the ones to call first; 73% of the count is that recent. Thunder Bay ranks 20 of 25 markets Builtie covers for masonry, behind Grande Prairie (78 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when masonry is awarded, and the job is big enough to be worth quoting: at least $10k of masonry work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Thunder Bay.
When masonry is awarded, and who decides
Builtie times masonry from about 10% of the way through the build to about 30%, with the last realistic approach at about 40%. The builder or general contractor awards masonry early, around the structure, because brick and stone have long lead times and set the exterior schedule.
Tap a stage. The highlighted stage is where masonry is typically awarded.
What to lead with when you call a builder in Thunder Bay: material lead times, crew availability and weather planning for the exterior schedule.
What the Thunder Bay data covers
The data is Thunder Bay's own building permits. Neighbouring cities issue their own permits and are not in this count.
Trades bought around the same stage in Thunder Bay
| Trade | Projects in the award window | Award window |
|---|---|---|
| Painting leads in Thunder Bay | 93 | 5% to 35% |
| Waterproofing leads in Thunder Bay | 76 | 10% to 35% |
| Roofing leads in Thunder Bay | 77 | 15% to 35% |
| Windows, Doors and Glazing leads in Thunder Bay | 81 | 15% to 35% |
| Elevators leads in Thunder Bay | 18 | 0% to 20% |
| Framing leads in Thunder Bay | 60 | 0% to 20% |
Every trade in Thunder Bay: Thunder Bay construction leads by trade. Every market for masonry: Masonry construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find masonry construction leads in Thunder Bay?
Start from building permits, not bid boards: most private masonry work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Thunder Bay's permits, keeps the projects still inside the masonry award window (70 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should masonry contractors contact a builder in Thunder Bay?
Builtie times masonry from about 10% of the way through the build to about 30%, with the last realistic approach at about 40%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards masonry work on new construction in Thunder Bay?
The builder or general contractor awards masonry early, around the structure, because brick and stone have long lead times and set the exterior schedule.
How many masonry projects does Builtie track in Thunder Bay?
70 projects were inside the masonry award window on October 9, 2026: 55 new buildings and 15 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.