100 Princess St, Thunder Bay: 3-Storey Retail Building Renovation

3-Storey Retail Building Renovation at 100 Princess St, Thunder Bay was permitted on August 31, 2026 with a stated construction value of $1M to $5M. Transportation Terminal - Alteration to a 3 Storey Airport Terminal - Interior Renovation of the 2nd floor to include a new Bar / Restaurant and an expansion of the existing Passenger Lounge. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 100 Princess St, Thunder Bay |
| Project | 3-Storey Retail Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | August 31, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Transportation Terminal - Alteration to a 3 Storey Airport Terminal - Interior Renovation of the 2nd floor to include a new Bar / Restaurant and an expansion of the existing Passenger Lounge”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Thunder Bay
- 206 Archibald St S: 3-Storey Rental Building
- 1040 Red Pine Way: Apartment Building
- 860 Red River Rd: 4-Storey Hotel
- 971 Carrick St: Retail Building Renovation
- 567 County Blvd: 3-Storey Rental Building
All of them: construction projects in Thunder Bay by address. The data is Thunder Bay's own building permits. Neighbouring cities issue their own permits and are not in this count.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 100 Princess St?
3-Storey Retail Building Renovation. Transportation Terminal - Alteration to a 3 Storey Airport Terminal - Interior Renovation of the 2nd floor to include a new Bar / Restaurant and an expansion of the existing Passenger Lounge
When was the permit issued for 100 Princess St?
August 31, 2026, by the City of Thunder Bay.
Who is building 100 Princess St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 100 Princess St need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
