9 Leslie St, Toronto: Utility Facility

Utility Facility at 9 Leslie St, Toronto was permitted on November 28, 2025 with a stated construction value of $100M to $250M. Proposed: construction of the pump house building facility structure including deep shafts, operating floor, second floor, administrative floor and roof. scope of work also covers architectural finishing and hardware Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 9 Leslie St, Toronto |
| Project | Utility Facility |
| Building type | Residential |
| Work | New building |
| Permit issued | November 28, 2025 |
| Stated construction value | $100M to $250M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposed: construction of the pump house building facility structure including deep shafts, operating floor, second floor, administrative floor and roof. scope of work also covers architectural finishing and hardware”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 120 Peter St: Apartment Building Renovation
- 6 Tippett Rd: 16-Storey Mixed-Use Building
- 300 Bloor St W: 29-Storey Mixed-Use Building
- 80 Scottfield Dr: 5-Storey Long-Term Care Home
- 3450 Dufferin St: 25-Storey Townhomes
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 9 Leslie St?
Utility Facility. Proposed: construction of the pump house building facility structure including deep shafts, operating floor, second floor, administrative floor and roof. scope of work also covers architectural finishing and hardware
When was the permit issued for 9 Leslie St?
November 28, 2025, by the City of Toronto.
Who is building 9 Leslie St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 9 Leslie St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.