Construction Permits in Yonge-Bay Corridor, Toronto: 697 in Twelve Months

The City of Toronto issued 697 construction permits in Yonge-Bay Corridor from August 2025 to July 2026, up 54% on the twelve months before, which ranks it 1 of the 72 Toronto neighbourhoods with 100 or more.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
Construction permits in Yonge-Bay Corridor
| Measure | Yonge-Bay Corridor |
|---|---|
| Permits issued, August 2025 to July 2026 | 697 |
| The twelve months before | 454 |
| Change | +54% |
| May to July 2026 | 6 |
| Rank among 72 busy neighbourhoods | 1 of 72 |
| Building type | Permits |
|---|---|
| Commercial | 630 |
| Institutional | 38 |
| Residential | 10 |
Commercial work leads: fit-outs and alterations to offices and stores, where the tenant or landlord decides through a general or interior contractor.
The ten busiest neighbourhoods, read October 9, 2026.
Neighbourhoods with similar activity
| Neighbourhood | Permits | Largest type |
|---|---|---|
| Banbury-Don Mills | 518 | residential |
| South Riverdale | 356 | residential |
| Annex | 356 | residential |
| Rosedale-Moore Park | 283 | residential |
Selling into Yonge-Bay Corridor
Toronto is Builtie's founding market and its deepest data: each permit is matched to the builder, the design team and the trades already credited on the job, with a verified decision maker on most active files. Trades: Drywall, Electrical, HVAC and Mechanical, Fire Protection, Low Voltage and Data, Flooring, Painting, Finish Carpentry, Signage and Wayfinding.
All neighbourhoods: Toronto construction permits by neighbourhood. Building types: residential, commercial, institutional, industrial.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
How many building permits were issued in Yonge-Bay Corridor, Toronto?
697 from August 2025 to July 2026, against 454 in the twelve months before, read October 9, 2026.
What kind of construction is happening in Yonge-Bay Corridor?
commercial, 630 permits; institutional, 38 permits; residential, 10 permits. Commercial work leads: fit-outs and alterations to offices and stores, where the tenant or landlord decides through a general or interior contractor.
How do I find construction projects in Yonge-Bay Corridor before they are awarded?
Builtie reads the City of Toronto's permits, estimates each project's stage, and shows the ones still in your trade's award window with the builder and a verified decision maker.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
