Construction Permits in Yonge-Bay Corridor, Toronto: 697 in Twelve Months

Commercial building under construction with a tower crane
Figures read October 9, 2026.

The City of Toronto issued 697 construction permits in Yonge-Bay Corridor from August 2025 to July 2026, up 54% on the twelve months before, which ranks it 1 of the 72 Toronto neighbourhoods with 100 or more.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Construction permits in Yonge-Bay Corridor

MeasureYonge-Bay Corridor
Permits issued, August 2025 to July 2026697
The twelve months before454
Change+54%
May to July 20266
Rank among 72 busy neighbourhoods1 of 72
Building typePermits
Commercial630
Institutional38
Residential10

Commercial work leads: fit-outs and alterations to offices and stores, where the tenant or landlord decides through a general or interior contractor.

Toronto neighbourhoods: permits issued, August 2025 to July 2026 Yonge-Bay Corridor 697 Banbury-Don Mills 518 South Riverdale 356 Annex 356 Rosedale-Moore Park 283 Englemount-Lawrence 281 West Humber-Clairville 274 The Beaches 264 Stonegate-Queensway 237 Leaside-Bennington 233

The ten busiest neighbourhoods, read October 9, 2026.

Neighbourhoods with similar activity

NeighbourhoodPermitsLargest type
Banbury-Don Mills518residential
South Riverdale356residential
Annex356residential
Rosedale-Moore Park283residential

Selling into Yonge-Bay Corridor

Toronto is Builtie's founding market and its deepest data: each permit is matched to the builder, the design team and the trades already credited on the job, with a verified decision maker on most active files. Trades: Drywall, Electrical, HVAC and Mechanical, Fire Protection, Low Voltage and Data, Flooring, Painting, Finish Carpentry, Signage and Wayfinding.

All neighbourhoods: Toronto construction permits by neighbourhood. Building types: residential, commercial, institutional, industrial.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

How many building permits were issued in Yonge-Bay Corridor, Toronto?

697 from August 2025 to July 2026, against 454 in the twelve months before, read October 9, 2026.

What kind of construction is happening in Yonge-Bay Corridor?

commercial, 630 permits; institutional, 38 permits; residential, 10 permits. Commercial work leads: fit-outs and alterations to offices and stores, where the tenant or landlord decides through a general or interior contractor.

How do I find construction projects in Yonge-Bay Corridor before they are awarded?

Builtie reads the City of Toronto's permits, estimates each project's stage, and shows the ones still in your trade's award window with the builder and a verified decision maker.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.