Countertops Construction Leads by City (2026): 36,792 Projects in 25 Markets

Cabinetmaker assembling custom cabinetry in a millwork shop
Live figures read October 9, 2026. Builtie construction intelligence content.

On October 9, 2026, Builtie counted 36,792 countertop projects still inside the countertop award window across 25 markets in the United States and Canada. New York City leads with 16,045. The builder or general contractor awards countertops with or right after cabinetry; on custom and higher-end work the designer or owner chooses the material first.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Open countertop projects in every market Builtie covers

MarketState or provinceProjects in the award windowPermitted in the last 90 days
New York CityNew York16,0451,226
AustinTexas7,468399
Miami-DadeFlorida3,349188
CalgaryAlberta2,037137
Los AngelesCalifornia1,64175
TorontoOntario1,56765
NashvilleTennessee1,03786
ChicagoIllinois95365
VancouverBritish Columbia58331
SeattleWashington57044
San AntonioTexas3779
Fort WorthTexas2615
AirdrieAlberta15018
KitchenerOntario14720
TulsaOklahoma1036
Grande PrairieAlberta979
Little RockArkansas922
Overland ParkKansas661
Fayetteville, ArkansasArkansas593
Thunder BayOntario561
Windsor, OntarioOntario441
Broken ArrowOklahoma360
North Little RockArkansas260
Red DeerAlberta243
St. LouisMissouri4

Across the 25 markets, 36,792 countertop projects were inside the award window on October 9, 2026: 32,087 in the United States and 4,705 in Canada, 2,398 of them permitted in the last 90 days. Each market counts its own city's permits only, so a large count says as much about how much a city publishes as about how much it builds.

Countertops: projects in the award window, by market New York City 16,045 Austin 7,468 Miami-Dade 3,349 Calgary 2,037 Los Angeles 1,641 Toronto 1,567 Nashville 1,037 Chicago 953 Vancouver 583 Seattle 570 San Antonio 377 Fort Worth 261

The twelve largest of 25 markets, read October 9, 2026.

When countertop is awarded, and who decides

Builtie times countertop from about 55% of the way through the build to about 75%, with the last realistic approach at about 85%. The builder or general contractor awards countertops with or right after cabinetry; on custom and higher-end work the designer or owner chooses the material first.

Tap a stage. The highlighted stage is where countertop is typically awarded.

What to lead with: template-to-install turnaround, slab availability and how you coordinate with the cabinet installer.

Running the pipeline

Countertops work comes in waves that follow the permit record, so the pipeline that wins it starts from projects, not from a contact list. Track each project's stage, call the builder when it enters the window, and keep the cabinet installer, the template date and the material the designer has specified in the record. CRM for countertop fabricators covers what to look for in a CRM built around that.

More: construction leads for subcontractors, and every market and trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

Where are the most countertop construction leads in North America?

Among the markets Builtie covers, on October 9, 2026: New York City, 16,045 projects; Austin, 7,468 projects; Miami-Dade, 3,349 projects; Calgary, 2,037 projects; Los Angeles, 1,641 projects.

When should countertop fabricators contact builders?

Builtie times countertop from about 55% of the way through the build to about 75%, with the last realistic approach at about 85%.

Who decides on countertop for a new building?

The builder or general contractor awards countertops with or right after cabinetry; on custom and higher-end work the designer or owner chooses the material first.

How are these countertop projects counted?

A project counts when its permit was issued in the last four years, the build is still inside the countertop award window and the job is at least $3k of countertop work. Trade sub-permits are grouped into their parent project.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.