Countertops Construction Leads in New York City (2026): 16,045 Projects in the Award Window

Cabinetmaker assembling custom cabinetry in a millwork shop
Live figures read October 9, 2026. Builtie construction intelligence content.

To find countertop construction leads in New York City, work from building permits and time the call to the build stage. On October 9, 2026, 16,045 permitted projects in New York City were still at the point where countertop is awarded. The builder or general contractor awards countertops with or right after cabinetry; on custom and higher-end work the designer or owner chooses the material first. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many countertop projects are open in New York City right now

MeasureNew York City
Projects in the countertop award window16,045
New buildings / renovations and alterations4,126 / 11,919
Permitted in the last 90 days1,226
Rank among 25 markets for countertop1 of 25
Newest permit in the New York City feedOctober 7, 2026

26% of them are new buildings and 74% are renovations, additions or alterations, so most of it sits in renovations and fit-outs, where the owner, a designer or a renovation contractor often makes the call. Only 8% were permitted in the last 90 days, and that is expected: countertop is bought late, so a project permitted a year ago is only now reaching the stage where the countertop contract is decided. New York City ranks 1 of 25 markets Builtie covers for countertop, ahead of every other market.

A project counts when its permit was issued in the last four years, the build is still inside the stage when countertop is awarded, and the job is big enough to be worth quoting: at least $3k of countertop work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Countertops: projects in the award window, by market New York City 16,045 Austin 7,468 Miami-Dade 3,349 Calgary 2,037 Los Angeles 1,641 Toronto 1,567 Nashville 1,037 Chicago 953 Vancouver 583 Seattle 570

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets.

When countertop is awarded, and who decides

Builtie times countertop from about 55% of the way through the build to about 75%, with the last realistic approach at about 85%. The builder or general contractor awards countertops with or right after cabinetry; on custom and higher-end work the designer or owner chooses the material first.

Tap a stage. The highlighted stage is where countertop is typically awarded.

What to lead with when you call a builder in New York City: template-to-install turnaround, slab availability and how you coordinate with the cabinet installer.

What the New York City data covers

All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

If you work from Jersey City, Hoboken, Newark, Yonkers and Long Island, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in New York City

TradeProjects in the award windowAward window
Finish Carpentry leads in New York City16,57355% to 75%
Cabinetry and Millwork leads in New York City16,57050% to 70%
Flooring leads in New York City17,43450% to 70%
Tile leads in New York City17,32545% to 65%
Appliances and Equipment leads in New York City15,83765% to 90%
Landscaping leads in New York City15,65465% to 90%

Every trade in New York City: New York City construction leads by trade. Every market for countertop: Countertops construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find countertop construction leads in New York City?

Start from building permits, not bid boards: most private countertop work is awarded by the builder or general contractor without a public bid. Builtie reads New York City's permits, keeps the projects still inside the countertop award window (16,045 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should countertop fabricators contact a builder in New York City?

Builtie times countertop from about 55% of the way through the build to about 75%, with the last realistic approach at about 85%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards countertop work on new construction in New York City?

The builder or general contractor awards countertops with or right after cabinetry; on custom and higher-end work the designer or owner chooses the material first.

How many countertop projects does Builtie track in New York City?

16,045 projects were inside the countertop award window on October 9, 2026: 4,126 new buildings and 11,919 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.