Tile Construction Leads in New York City (2026): 17,325 Projects in the Award Window

New carpet and seating in a finished conference room
Live figures read October 9, 2026. Builtie construction intelligence content.

To find tile construction leads in New York City, work from building permits and time the call to the build stage. On October 9, 2026, 17,325 permitted projects in New York City were still at the point where tile is awarded. The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many tile projects are open in New York City right now

MeasureNew York City
Projects in the tile award window17,325
New buildings / renovations and alterations4,268 / 13,057
Permitted in the last 90 days4,811
Rank among 25 markets for tile1 of 25
Newest permit in the New York City feedOctober 7, 2026

25% of them are new buildings and 75% are renovations, additions or alterations, so most of it sits in renovations and fit-outs, where the owner, a designer or a renovation contractor often makes the call. 4,811 of them (28%) were permitted in the last 90 days. New York City ranks 1 of 25 markets Builtie covers for tile, ahead of every other market.

A project counts when its permit was issued in the last four years, the build is still inside the stage when tile is awarded, and the job is big enough to be worth quoting: at least $4k of tile work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Tile: projects in the award window, by market New York City 17,325 Austin 7,532 Miami-Dade 3,615 Calgary 2,080 Los Angeles 1,913 Toronto 1,649 Nashville 1,081 Chicago 920 Seattle 582 Vancouver 578

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets.

When tile is awarded, and who decides

Builtie times tile from about 45% of the way through the build to about 65%, with the last realistic approach at about 75%. The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first.

Tap a stage. The highlighted stage is where tile is typically awarded.

What to lead with when you call a builder in New York City: product lead times, waterproofing in wet areas and install dates that follow drywall.

What the New York City data covers

All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

If you work from Jersey City, Hoboken, Newark, Yonkers and Long Island, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in New York City

TradeProjects in the award windowAward window
Cabinetry and Millwork leads in New York City16,57050% to 70%
Flooring leads in New York City17,43450% to 70%
Drywall leads in New York City21,10235% to 60%
Low Voltage and Data leads in New York City19,98635% to 60%
Signage and Wayfinding leads in New York City22,61525% to 70%
Countertops leads in New York City16,04555% to 75%

Every trade in New York City: New York City construction leads by trade. Every market for tile: Tile construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find tile construction leads in New York City?

Start from building permits, not bid boards: most private tile work is awarded by the builder or general contractor without a public bid. Builtie reads New York City's permits, keeps the projects still inside the tile award window (17,325 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should tile contractors contact a builder in New York City?

Builtie times tile from about 45% of the way through the build to about 65%, with the last realistic approach at about 75%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards tile work on new construction in New York City?

The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first.

How many tile projects does Builtie track in New York City?

17,325 projects were inside the tile award window on October 9, 2026: 4,268 new buildings and 13,057 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.