450 Lexington Avenue, Manhattan, New York City: Office and Tenant Fit-Out
Follow this project · we email you when its status or build stage changes

Office and Tenant Fit-Out at 450 Lexington Avenue, Manhattan, New York City was permitted on April 30, 2026 with a stated construction value of $10M to $25M. Interior demolition and installation of non-bearing partitions, doors and finishes No change in use, egress or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 450 Lexington Avenue, Manhattan, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | April 30, 2026 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior demolition and installation of non-bearing partitions, doors and finishes No change in use, egress or occupancy”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 202614 other permits at this building
- April 30, 2026Alteration: Office and Tenant Fit-Out · $10M to $25M (this page)
- April 30, 2026Alteration: demolition · $10M to $25M · filed as 446 Lexington Avenue, Manhattan
- April 30, 2026Alteration: mechanical · $1M to $5M
- April 30, 2026Alteration: plumbing · under $1M
- June 9, 2026Alteration: demolition · $5M to $10M
- June 10, 2026Alteration: elevator · $5M to $10M
- June 2026Estimated construction start (estimate)
- December 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 20 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 375 Madison Avenue, ManhattanAlteration: facade work · $100M to $250M · July 2026
- 325 Park Avenue, ManhattanAlteration: structural work · $100M to $250M · March 2026
- 229 East 42 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · July 2026
- 10 Rockefeller Plaza, ManhattanAlteration CO · $50M to $100M · July 2026
- 6 East 43 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · September 2026
172 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 5 to approach now, 5 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2027 | Estimate |
| Construction Site Security | May 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Oct 2026 | Approach now |
| Framing | Jun 2026 – Oct 2026 | Approach now |
| Painting | Jul 2026 – Jan 2027 | Approach now |
| Masonry | Jun 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Sep 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Dec 2026 | Approach now |
| Windows, Doors and Glazing | Jul 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Elevators leads in New York City · Framing leads in New York City · Painting leads in New York City · Roofing leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 2 Wall Street, Manhattan: Mixed-Use Building Renovation
- 830 3 Avenue, Manhattan: Office-to-Residential Conversion
- 69 Taaffe Place, Brooklyn: Office and Tenant Fit-Out
- 189 Allen Street, Manhattan: Apartment Building Renovation
- 738 Stanley Avenue, Brooklyn: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 450 Lexington Avenue, Manhattan?
Office and Tenant Fit-Out. Interior demolition and installation of non-bearing partitions, doors and finishes No change in use, egress or occupancy
When was the permit issued for 450 Lexington Avenue, Manhattan?
April 30, 2026, by New York City.
Who is building 450 Lexington Avenue, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 450 Lexington Avenue, Manhattan need now?
Estimated as of October 2026, the trades to approach now are elevator; framing; painting; roofing; window, door and glazing. Already passed: site security, concrete, structural steel, masonry and waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.