Drywall Construction Leads in Red Deer (2026): 29 Projects in the Award Window

An open wood-framed interior during construction
Live figures read October 9, 2026. Builtie construction intelligence content.

To find drywall construction leads in Red Deer, work from building permits and time the call to the build stage. On October 9, 2026, 29 permitted projects in the City of Red Deer were still at the point where drywall is awarded. The builder or general contractor awards drywall once the mechanical rough-ins are scheduled, usually to crews that can hold a tight board-and-tape sequence. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many drywall projects are open in Red Deer right now

MeasureRed Deer
Projects in the drywall award window29
New buildings / renovations and alterations14 / 15
Permitted in the last 90 days17
Rank among 25 markets for drywall25 of 25
Newest permit in the Red Deer feedOctober 7, 2026

48% of them are new buildings and 52% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. 17 of them (59%) were permitted in the last 90 days. Red Deer ranks 25 of 25 markets Builtie covers for drywall, behind St. Louis (30 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when drywall is awarded, and the job is big enough to be worth quoting: at least $5k of drywall work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Drywall: projects in the award window, by market New York City 21,102 Austin 8,366 Miami-Dade 4,496 Los Angeles 2,814 Calgary 2,473 Toronto 1,814 Nashville 1,423 Chicago 1,174 Seattle 729 Vancouver 685 Red Deer 29

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Red Deer.

When drywall is awarded, and who decides

Builtie times drywall from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. The builder or general contractor awards drywall once the mechanical rough-ins are scheduled, usually to crews that can hold a tight board-and-tape sequence.

Tap a stage. The highlighted stage is where drywall is typically awarded.

What to lead with when you call a builder in Red Deer: crew size, board and taping turnaround, fire-rated assemblies and how you handle the inspection sequence.

What the Red Deer data covers

The data is Red Deer's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a small feed, so a trade's count can change quickly.

Trades bought around the same stage in Red Deer

TradeProjects in the award windowAward window
Low Voltage and Data leads in Red Deer2235% to 60%
Signage and Wayfinding leads in Red Deer1525% to 70%
Insulation leads in Red Deer2430% to 55%
Tile leads in Red Deer2045% to 65%
Fire Protection leads in Red Deer1325% to 50%
Cabinetry and Millwork leads in Red Deer2350% to 70%

Every trade in Red Deer: Red Deer construction leads by trade. Every market for drywall: Drywall construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find drywall construction leads in Red Deer?

Start from building permits, not bid boards: most private drywall work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Red Deer's permits, keeps the projects still inside the drywall award window (29 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should drywall contractors contact a builder in Red Deer?

Builtie times drywall from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards drywall work on new construction in Red Deer?

The builder or general contractor awards drywall once the mechanical rough-ins are scheduled, usually to crews that can hold a tight board-and-tape sequence.

How many drywall projects does Builtie track in Red Deer?

29 projects were inside the drywall award window on October 9, 2026: 14 new buildings and 15 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.