139 Northey Av, Red Deer: 2-Storey Retail Building

2-Storey Retail Building at 139 Northey Av, Red Deer was permitted on July 8, 2026. COM-NEW - Hope Mission - A2 assembly, sprinklered no standpipe, 2 storey - precast concrete. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 139 Northey Av, Red Deer |
| Project | 2-Storey Retail Building |
| Building type | Institutional |
| Work | New building |
| Permit issued | July 8, 2026 |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “COM-NEW - Hope Mission - A2 assembly, sprinklered no standpipe, 2 storey - precast concrete”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Red Deer
- 4800 Capstone Wy: Townhomes
- 2901 50 Av: Office and Tenant Fit-Out
- 6739 67 Av: 2-Storey Warehouse Renovation
- 2101 499 Timberlands Dr: Rental Building
- 120 2810 50 Av: Retail Building Renovation
All of them: construction projects in Red Deer by address. The data is Red Deer's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a small feed, so a trade's count can change quickly.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 139 Northey Av?
2-Storey Retail Building. COM-NEW - Hope Mission - A2 assembly, sprinklered no standpipe, 2 storey - precast concrete
When was the permit issued for 139 Northey Av?
July 8, 2026, by the City of Red Deer.
Who is building 139 Northey Av?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 139 Northey Av need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.