4800 Capstone Wy, Red Deer: Townhomes

Townhomes at 4800 Capstone Wy, Red Deer was permitted on October 31, 2025. COM-NEW - 119 unit mult-residential building. Use C designed to NBC23AE, 1491.11 m² footprint, sprinklered non-combustible w/ standpipe. 39 single bed units, 4 bed & den units, 45 two bed, 13 two storey townhouses, 18 studio units. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 4800 Capstone Wy, Red Deer |
| Project | Townhomes |
| Building type | Commercial |
| Work | New building |
| Permit issued | October 31, 2025 |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “COM-NEW - 119 unit mult-residential building. Use C designed to NBC23AE, 1491.11 m² footprint, sprinklered non-combustible w/ standpipe. 39 single bed units, 4 bed & den units, 45 two bed, 13 two storey townhouses, 18 studio units”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Red Deer
- 2101 499 Timberlands Dr: Rental Building
- 139 Northey Av: 2-Storey Retail Building
- 6 Colby Av: Apartment Building
- 9 100 Donald Bl: Institutional Project Renovation
- 2901 50 Av: Office and Tenant Fit-Out
All of them: construction projects in Red Deer by address. The data is Red Deer's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a small feed, so a trade's count can change quickly.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 4800 Capstone Wy?
Townhomes. COM-NEW - 119 unit mult-residential building. Use C designed to NBC23AE, 1491.11 m² footprint, sprinklered non-combustible w/ standpipe. 39 single bed units, 4 bed & den units, 45 two bed, 13 two storey townhouses, 18 studio units
When was the permit issued for 4800 Capstone Wy?
October 31, 2025, by the City of Red Deer.
Who is building 4800 Capstone Wy?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 4800 Capstone Wy need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
