Howard Building Corporation: 30 Permits Since January 2025

Howard Building Corporation was filed or named on 30 building permits in Los Angeles from January 2025 to October 2026, 4 of them in the last 90 days. Its work is mostly renovations and alterations, so the interior and finishing trades are the ones it buys most often. Trades use Builtie to follow builders like this one: each new permit shows up with its stage and the trades still to be picked, and the outreach runs from there.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
Howard Building Corporation by the numbers
| Measure | Howard Building Corporation |
|---|---|
| Permits since January 2025 | 30 |
| Permitted in the last 90 days | 4 |
| New buildings / renovations | 0 / 30 |
| Median stated value per permit | under $1M |
| Active months since January 2025 | 14 |
| First and latest permit | January 14, 2025 to August 31, 2026 |
Permits naming Howard Building Corporation, read October 15, 2026.
What Howard Building Corporation builds
Its permits are mostly renovations and alterations, so the interior and finishing trades are the ones it buys most often. By building type: 30 commercial.
Where: Los Angeles.
Markets: Los Angeles (30).
Recent and largest permits
- 12100 W Olympic Blvd 200, May 26, 2026: 50% PDPP FOR REVIEW OF ZONING AND FIRE LIFE SAFETY**Complete interior Tenant improvement at 2nd floor. Work includes demo of non-structural
- 640 N Sepulveda Blvd, September 10, 2025: Remodel to (e) 2 story office building with 2 levels of underground parking includes refinishing and insulating or cement plaster cladding,
- 640 N Sepulveda Blvd, June 12, 2026: Tenant improvement to (e) office space on 2nd floor
- 555 S FLOWER ST 49-50 flrs, November 17, 2025: Office T.I. including new non-load bearing partitions, ceiling, finishes and millwork. Upgrade existing restrooms. New gender neutral restro
Selling to Howard Building Corporation
In Builtie: the decision makers at Howard Building Corporation with verified contacts, every new permit it files as it is issued, the stage of each project and LinkedIn and email outreach in your name. The permit record above is public; who to call, and when, is what Builtie adds.
Other active companies in Los Angeles
- T J C Home Builders LLC (87 permits)
- C S W F Construction Inc (67 permits)
- Pacific Coast Builders (62 permits)
- Adu Express Construction LLC (52 permits)
- Dolan Design & Build LLC (48 permits)
- Arrow Construction Co (44 permits)
All of them: construction companies in Los Angeles.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is Howard Building Corporation building?
Its 30 permits since January 2025 are mostly renovations and alterations, so the interior and finishing trades are the ones it buys most often.
How many permits has Howard Building Corporation been filed or named on?
30 since January 2025, 4 of them in the last 90 days, read October 15, 2026.
How do I reach the decision makers at Howard Building Corporation?
Builtie attaches the decision makers at the company named on each permit, with verified contacts, and runs the outreach.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
