Low Voltage and Data Construction Leads in San Antonio (2026): 517 Projects in the Award Window

To find low-voltage construction leads in San Antonio, work from building permits and time the call to the build stage. On October 9, 2026, 517 permitted projects in the City of San Antonio were still at the point where low-voltage is awarded. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many low-voltage projects are open in San Antonio right now
| Measure | San Antonio |
|---|---|
| Projects in the low-voltage award window | 517 |
| New buildings / renovations and alterations | 484 / 33 |
| Permitted in the last 90 days | 66 |
| Rank among 25 markets for low-voltage | 11 of 25 |
| Newest permit in the San Antonio feed | October 2, 2026 |
94% of them are new buildings and 6% are renovations, additions or alterations, so most of this work is awarded by builders and developers on ground-up projects. 66 of them (13%) were permitted in the last 90 days. San Antonio ranks 11 of 25 markets Builtie covers for low-voltage, behind Vancouver (650 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when low-voltage is awarded, and the job is big enough to be worth quoting: at least $4k of low-voltage work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus San Antonio.
When low-voltage is awarded, and who decides
Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.
Tap a stage. The highlighted stage is where low-voltage is typically awarded.
What to lead with when you call a builder in San Antonio: structured cabling, security and access-control integration, and coordination with the electrical rough-in.
What the San Antonio data covers
The data is San Antonio's own building permits. Neighbouring cities issue their own permits and are not in this count. The permit names a contact person; Builtie resolves the company behind it before a project is shown.
If you work from New Braunfels, Schertz, Boerne and the rest of Bexar County, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.
Trades bought around the same stage in San Antonio
| Trade | Projects in the award window | Award window |
|---|---|---|
| Drywall leads in San Antonio | 522 | 35% to 60% |
| Signage and Wayfinding leads in San Antonio | 698 | 25% to 70% |
| Insulation leads in San Antonio | 451 | 30% to 55% |
| Tile leads in San Antonio | 475 | 45% to 65% |
| Fire Protection leads in San Antonio | 522 | 25% to 50% |
| Cabinetry and Millwork leads in San Antonio | 410 | 50% to 70% |
Every trade in San Antonio: San Antonio construction leads by trade. Every market for low-voltage: Low Voltage and Data construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find low-voltage construction leads in San Antonio?
Start from building permits, not bid boards: most private low-voltage work is awarded by the builder or general contractor without a public bid. Builtie reads the City of San Antonio's permits, keeps the projects still inside the low-voltage award window (517 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should low-voltage and data contractors contact a builder in San Antonio?
Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards low-voltage work on new construction in San Antonio?
The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.
How many low-voltage projects does Builtie track in San Antonio?
517 projects were inside the low-voltage award window on October 9, 2026: 484 new buildings and 33 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
