Tile Construction Leads in Broken Arrow (2026): 33 Projects in the Award Window

To find tile construction leads in Broken Arrow, work from building permits and time the call to the build stage. On October 9, 2026, 33 permitted projects in the City of Broken Arrow were still at the point where tile is awarded. The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many tile projects are open in Broken Arrow right now
| Measure | Broken Arrow |
|---|---|
| Projects in the tile award window | 33 |
| New buildings / renovations and alterations | 20 / 13 |
| Permitted in the last 90 days | 0 |
| Rank among 25 markets for tile | 23 of 25 |
| Newest permit in the Broken Arrow feed | October 5, 2026 |
61% of them are new buildings and 39% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. 0 of them (0%) were permitted in the last 90 days. Broken Arrow ranks 23 of 25 markets Builtie covers for tile, behind North Little Rock (44 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when tile is awarded, and the job is big enough to be worth quoting: at least $4k of tile work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Broken Arrow.
When tile is awarded, and who decides
Builtie times tile from about 45% of the way through the build to about 65%, with the last realistic approach at about 75%. The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first.
Tap a stage. The highlighted stage is where tile is typically awarded.
What to lead with when you call a builder in Broken Arrow: product lead times, waterproofing in wet areas and install dates that follow drywall.
What the Broken Arrow data covers
The data is Broken Arrow's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a smaller feed than Tulsa's, so the counts move more from month to month.
Trades bought around the same stage in Broken Arrow
| Trade | Projects in the award window | Award window |
|---|---|---|
| Cabinetry and Millwork leads in Broken Arrow | 42 | 50% to 70% |
| Flooring leads in Broken Arrow | 43 | 50% to 70% |
| Drywall leads in Broken Arrow | 36 | 35% to 60% |
| Low Voltage and Data leads in Broken Arrow | 35 | 35% to 60% |
| Signage and Wayfinding leads in Broken Arrow | 54 | 25% to 70% |
| Countertops leads in Broken Arrow | 36 | 55% to 75% |
Every trade in Broken Arrow: Broken Arrow construction leads by trade. Every market for tile: Tile construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find tile construction leads in Broken Arrow?
Start from building permits, not bid boards: most private tile work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Broken Arrow's permits, keeps the projects still inside the tile award window (33 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should tile contractors contact a builder in Broken Arrow?
Builtie times tile from about 45% of the way through the build to about 65%, with the last realistic approach at about 75%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards tile work on new construction in Broken Arrow?
The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first.
How many tile projects does Builtie track in Broken Arrow?
33 projects were inside the tile award window on October 9, 2026: 20 new buildings and 13 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
