1423 E College St, Broken Arrow: Apartment Building

Apartment Building at 1423 E College St, Broken Arrow was permitted on June 11, 2026. The Villages at Rose Hill - Building 200 - New Construction of 41 residential multi-family dwelling units. Building Permit is for #2 of 8 separate structures. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1423 E College St, Broken Arrow |
| Project | Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | June 11, 2026 |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “The Villages at Rose Hill - Building 200 - New Construction of 41 residential multi-family dwelling units. Building Permit is for #2 of 8 separate structures”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Broken Arrow
- 1419 E College St: Apartment Building
- 4217 W Seattle St: Commercial Project Renovation
- 5900 W Florence St: Place of Worship Renovation
- 4103 E Omaha St: Transit Facility
- 6111 S Aspen Ave: Retail Building
All of them: construction projects in Broken Arrow by address. The data is Broken Arrow's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a smaller feed than Tulsa's, so the counts move more from month to month.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1423 E College St?
Apartment Building. The Villages at Rose Hill - Building 200 - New Construction of 41 residential multi-family dwelling units. Building Permit is for #2 of 8 separate structures
When was the permit issued for 1423 E College St?
June 11, 2026, by the City of Broken Arrow.
Who is building 1423 E College St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1423 E College St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
