Tile Construction Leads in Overland Park (2026): 111 Projects in the Award Window

New carpet and seating in a finished conference room
Live figures read October 9, 2026. Builtie construction intelligence content.

To find tile construction leads in Overland Park, work from building permits and time the call to the build stage. On October 9, 2026, 111 permitted projects in the City of Overland Park were still at the point where tile is awarded. The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many tile projects are open in Overland Park right now

MeasureOverland Park
Projects in the tile award window111
New buildings / renovations and alterations75 / 36
Permitted in the last 90 days15
Median declared construction value$654,417
Rank among 25 markets for tile18 of 25
Newest permit in the Overland Park feedOctober 6, 2026

68% of them are new buildings and 32% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. 15 of them (14%) were permitted in the last 90 days. Overland Park ranks 18 of 25 markets Builtie covers for tile, behind Little Rock (117 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when tile is awarded, and the job is big enough to be worth quoting: at least $4k of tile work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Tile: projects in the award window, by market New York City 17,325 Austin 7,532 Miami-Dade 3,615 Calgary 2,080 Los Angeles 1,913 Toronto 1,649 Nashville 1,081 Chicago 920 Seattle 582 Vancouver 578 Overland Park 111

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Overland Park.

When tile is awarded, and who decides

Builtie times tile from about 45% of the way through the build to about 65%, with the last realistic approach at about 75%. The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first.

Tap a stage. The highlighted stage is where tile is typically awarded.

What to lead with when you call a builder in Overland Park: product lead times, waterproofing in wet areas and install dates that follow drywall.

What the Overland Park data covers

The data is Overland Park's own building permits. Neighbouring cities issue their own permits and are not in this count. Olathe, Lenexa and Kansas City issue their own permits.

If you work from Olathe, Lenexa, Leawood and Kansas City, Kansas, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in Overland Park

TradeProjects in the award windowAward window
Cabinetry and Millwork leads in Overland Park12850% to 70%
Flooring leads in Overland Park16350% to 70%
Drywall leads in Overland Park18335% to 60%
Low Voltage and Data leads in Overland Park16635% to 60%
Signage and Wayfinding leads in Overland Park6925% to 70%
Countertops leads in Overland Park6655% to 75%

Every trade in Overland Park: Overland Park construction leads by trade. Every market for tile: Tile construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find tile construction leads in Overland Park?

Start from building permits, not bid boards: most private tile work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Overland Park's permits, keeps the projects still inside the tile award window (111 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should tile contractors contact a builder in Overland Park?

Builtie times tile from about 45% of the way through the build to about 65%, with the last realistic approach at about 75%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards tile work on new construction in Overland Park?

The builder or general contractor awards tile around drywall; on custom and higher-end work the designer or owner chooses the product first.

How many tile projects does Builtie track in Overland Park?

111 projects were inside the tile award window on October 9, 2026: 75 new buildings and 36 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.