100-800 World Way, Los Angeles: Commercial Project Renovation

Commercial Project Renovation at 100-800 World Way, Los Angeles was permitted on June 10, 2026 with a stated construction value of $100M to $250M. **ePlan**LAX**The LAX Curbside Improvement and Landscape Program upgrades the Central Terminal Area to improve the accessibility, safety, and aesthetics. Work includes resurfacing sidewalks and islands with epoxy coating, adding benches, increasing… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 100-800 World Way, Los Angeles |
| Project | Commercial Project Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | June 10, 2026 |
| Stated construction value | $100M to $250M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “**ePlan**LAX**The LAX Curbside Improvement and Landscape Program upgrades the Central Terminal Area to improve the accessibility, safety, and aesthetics. Work includes resurfacing sidewalks and islands with epoxy coating, adding benches, increasing…”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 8730 W Alden Dr: 10-Storey Commercial Project
- 6055 W Center Dr 1-386: 19-Storey Apartment Building
- 6501 S Sepulveda Blvd 1-362: 8-Storey Mixed-Use Building
- 5021 W Coliseum St 1-800: 6-Storey Affordable Housing
- 333 S Flower St 1-512: 13-Storey Affordable Housing Renovation
All of them: major construction projects in Los Angeles. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Pasadena, Glendale, Burbank, Long Beach and the rest of Los Angeles County issue their own permits and are not in the feed today. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 100-800 World Way?
Commercial Project Renovation. **ePlan**LAX**The LAX Curbside Improvement and Landscape Program upgrades the Central Terminal Area to improve the accessibility, safety, and aesthetics. Work includes resurfacing sidewalks and islands with epoxy coating, adding benches, increasing…
When was the permit issued for 100-800 World Way?
June 10, 2026, by the City of Los Angeles.
Who is building 100-800 World Way?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 100-800 World Way need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
