100 Haynes Ave, Toronto: 8-Storey Student Residence Renovation

8-Storey Student Residence Renovation at 100 Haynes Ave, Toronto was permitted on September 11, 2025 with a stated construction value of $50M to $100M. Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 100 Haynes Ave, Toronto |
| Neighbourhood | York University Heights |
| Project | 8-Storey Student Residence Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | September 11, 2025 |
| Stated construction value | $50M to $100M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 95 Haynes Ave: 8-Storey Student Residence Renovation
- 908 St Clair Ave W: 13-Storey Mixed-Use Building
- 25 Sewells Rd: 9-Storey Affordable Housing
- 20 Brow Dr: Transit Facility
- 2901 Bayview Ave: 23-Storey Mixed-Use Building
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 100 Haynes Ave?
8-Storey Student Residence Renovation. Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units
When was the permit issued for 100 Haynes Ave?
September 11, 2025, by the City of Toronto.
Who is building 100 Haynes Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 100 Haynes Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.