16 Earlington Ave, Toronto: Apartment Building

Apartment Building at 16 Earlington Ave, Toronto was permitted on August 29, 2025 with a stated construction value of $5M to $10M. Construct a four (4) storey with one storey at grade parking garage, with 10 units of back to back towns above Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 16 Earlington Ave, Toronto |
| Neighbourhood | Kingsway South |
| Project | Apartment Building |
| Building type | Commercial |
| Work | New building |
| Permit issued | August 29, 2025 |
| Housing units | 10 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Construct a four (4) storey with one storey at grade parking garage, with 10 units of back to back towns above”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 2250 Markham Rd: 5-Storey Self-Storage Building
- 1660 Bloor St W: 13-Storey Condominium
- 17 Dora Ave: Transit Facility
- 1053 The Queensway: Retail Building
- 157 Delaware Ave: Apartment Building
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 16 Earlington Ave?
Apartment Building. Construct a four (4) storey with one storey at grade parking garage, with 10 units of back to back towns above
When was the permit issued for 16 Earlington Ave?
August 29, 2025, by the City of Toronto.
Who is building 16 Earlington Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 16 Earlington Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
