1660 Bloor St W, Toronto: 13-Storey Condominium

13-Storey Condominium at 1660 Bloor St W, Toronto was permitted on October 23, 2025 with a stated construction value of $10M to $25M. Proposal to construct 13 storey residential condominium with four levels of below grade parking Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1660 Bloor St W, Toronto |
| Neighbourhood | High Park North |
| Project | 13-Storey Condominium |
| Building type | Residential |
| Work | New building |
| Permit issued | October 23, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to construct 13 storey residential condominium with four levels of below grade parking”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 17 Dora Ave: Transit Facility
- 2250 Markham Rd: 5-Storey Self-Storage Building
- 16 Earlington Ave: Apartment Building
- 568 Passmore Ave: Apartment Building
- 419 Burnhamthorpe Rd: Townhomes
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1660 Bloor St W?
13-Storey Condominium. Proposal to construct 13 storey residential condominium with four levels of below grade parking
When was the permit issued for 1660 Bloor St W?
October 23, 2025, by the City of Toronto.
Who is building 1660 Bloor St W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1660 Bloor St W need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
