568 Passmore Ave, Toronto: Apartment Building

Apartment Building at 568 Passmore Ave, Toronto was permitted on October 1, 2025 with a stated construction value of $10M to $25M. New fire protection engineer Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 568 Passmore Ave, Toronto |
| Neighbourhood | Milliken |
| Project | Apartment Building |
| Building type | Industrial |
| Work | New building |
| Permit issued | October 1, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “New fire protection engineer”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 419 Burnhamthorpe Rd: Townhomes
- 1830 Ellesmere Rd: Place of Worship
- 1660 Bloor St W: 13-Storey Condominium
- 17 Dora Ave: Transit Facility
- 2250 Markham Rd: 5-Storey Self-Storage Building
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 568 Passmore Ave?
Apartment Building. New fire protection engineer
When was the permit issued for 568 Passmore Ave?
October 1, 2025, by the City of Toronto.
Who is building 568 Passmore Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 568 Passmore Ave need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
