227 Gerrard St E, Toronto: Mixed-Use Building

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

Mixed-Use Building at 227 Gerrard St E, Toronto was permitted on October 27, 2025 with a stated construction value of $25M to $50M. Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address227 Gerrard St E, Toronto
NeighbourhoodMoss Park
ProjectMixed-Use Building
Building typeCommercial
WorkNew building
Permit issuedOctober 27, 2025
Housing units116
Stated construction value$25M to $50M
Estimated stageFoundation
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 227 Gerrard St E?

Mixed-Use Building. Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage

When was the permit issued for 227 Gerrard St E?

October 27, 2025, by the City of Toronto.

Who is building 227 Gerrard St E?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 227 Gerrard St E need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.