285 Shuter St, Toronto: Apartment Building Renovation

Apartment Building Renovation at 285 Shuter St, Toronto was permitted on January 23, 2026 with a stated construction value of $1M to $5M. Proposal for replacement of all plumbing and sanitary risers and branches piping from 3rd floor to penthouse and in all tenant units. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 285 Shuter St, Toronto |
| Neighbourhood | Moss Park |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | January 23, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Martinway Contracting Limited |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for replacement of all plumbing and sanitary risers and branches piping from 3rd floor to penthouse and in all tenant units”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 140 Sherbourne St: Institutional Project Renovation
- 138 Sherbourne St: Transit Facility Renovation
- 209 Carlton St: Affordable Housing Renovation
- 25 Ontario St: Office and Tenant Fit-Out
- 227 Gerrard St E: Mixed-Use Building
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 285 Shuter St?
Apartment Building Renovation. Proposal for replacement of all plumbing and sanitary risers and branches piping from 3rd floor to penthouse and in all tenant units
When was the permit issued for 285 Shuter St?
January 23, 2026, by the City of Toronto.
Who is building 285 Shuter St?
Martinway Contracting Limited is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 285 Shuter St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
