140 Sherbourne St, Toronto: Institutional Project Renovation

Institutional Project Renovation at 140 Sherbourne St, Toronto was permitted on February 23, 2026 with a stated construction value of $1M to $5M. Proposed addition to existing arena to be used as refrigeration room. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 140 Sherbourne St, Toronto |
| Neighbourhood | Moss Park |
| Project | Institutional Project Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | February 23, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Frank Pellegrino General Contracting |
| Decision makers and contacts | In Builtie |
From the permit: “Proposed addition to existing arena to be used as refrigeration room”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 138 Sherbourne St: Transit Facility Renovation
- 285 Shuter St: Apartment Building Renovation
- 209 Carlton St: Affordable Housing Renovation
- 25 Ontario St: Office and Tenant Fit-Out
- 227 Gerrard St E: Mixed-Use Building
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 140 Sherbourne St?
Institutional Project Renovation. Proposed addition to existing arena to be used as refrigeration room
When was the permit issued for 140 Sherbourne St?
February 23, 2026, by the City of Toronto.
Who is building 140 Sherbourne St?
Frank Pellegrino General Contracting is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 140 Sherbourne St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
