316 Campbell Ave, Toronto: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 15, 2026 from Builtie's permit data.

Apartment Building Renovation at 316 Campbell Ave, Toronto was permitted on July 28, 2025 with a stated construction value of $10M to $25M. Standalone shoring and excavation for the purposes of site remediation Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address316 Campbell Ave, Toronto
NeighbourhoodJunction-Wallace Emerson
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJuly 28, 2025
Stated construction value$10M to $25M
Estimated stageFraming
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Standalone shoring and excavation for the purposes of site remediation”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 316 Campbell Ave?

Apartment Building Renovation. Standalone shoring and excavation for the purposes of site remediation

When was the permit issued for 316 Campbell Ave?

July 28, 2025, by the City of Toronto.

Who is building 316 Campbell Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 316 Campbell Ave need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.